1. Home
  2. Jobs
  3. Electrical Engineer jobs in India
  4. SSH Electrical
Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 22476620

    Aditya Birla Group logo

    SSH Electrical

    Aditya Birla Group · Not specified · onsite · Posted 1d ago

    Not disclosedFresherfulltimeSourced fromFoundit

    About a minute. You'll make an account on the way through.

    About this role

    Job Purpose

    To manage and maintain the electrical systems and equipment in the Coal Handling Plant (CHP) and Rapid Loading System (RLS), ensuring safe, efficient, and reliable operation. Responsible for the planning, installation, maintenance, and troubleshooting of electrical infrastructure, ensuring compliance with safety standards and regulations. The role aims to minimize downtime, optimize energy usage, and support the continuous and effective handling of coal from the mine to loading systems.

    Job Context & Major Challenges

    Job Context

    Amelia Coal Mine is located in the Main basin of Singrauli Coalfield, Singrauli District of Madhya Pradesh (37 km from Singrauli City). The block has been allotted to THDC India Limited, a Mini Ratna Public Sector Undertaking (Joint Venture of NTPC Limited and Government of Uttar Pradesh). THDC has appointed Amelia Coal Mining Limited as their MDO. In FY2023, ACML has begun Overburden Removal and Coal Production. State of Art Technology utilized in Amelia Coal Mine is combination of shovels and dumpers and Surface Miners. Amelia Coal Mine is currently in the ramp-up phase with Peak Rated Capacity (PRC) of 5.6 Million Tonnes Per Annum. Scope of the MDO includes Access to Site, Finance, deploy HEMM, Operate and Maintain Mine, excavate and deliver coal; Construction and Maintain of Coal Handling Plant (CHP), infrastructure including Conveyor (Mine to Railway Siding), Railway Siding, Approach and Access Roads; Arrange Power Supply, Undertake Land Acquisition, R&R, obtain possession of land, procure and renew EC, FC, licenses, permits, etc.

    Major Challenges

    Some of the major challenges includes achieve and maintain peak coal production and overburden removal, ensure safe operation, maintain coal quality, shifting of Project PDFs, facilitate land acquisition, physical possession of land, implementation of R&R policy, construction, operation and maintenance of Coal Handling Plant (CHP), Coal Conveyor and Railway Siding, compliance with statutory norms, renewal/ amendment of statutory clearances, undertake progressive mine closure, facilitate smooth operation and comply with the requirements as per terms of contract with THDC, Contractors, Sub-Contractors, etc.

    Key Result Areas

    KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)

    KRA1 Electrical Maintenance & Repair Ensure timely and effective maintenance of all electrical systems and equipment in the CHP & RLS to avoid unplanned downtimes.

    KRA2 System Monitoring & Troubleshooting Monitor electrical systems and control panels for faults, troubleshoot problems, and conduct repairs to restore operations swiftly.

    KRA3 Safety Compliance Ensure all electrical systems adhere to safety regulations, and conduct regular inspections to prevent electrical hazards.

    KRA4 Energy Management Optimize energy consumption, implement energy-efficient solutions, and monitor energy usage for cost and environmental improvements.

    KRA5 Preventive Maintenance Develop and implement preventive maintenance schedules for electrical systems and maintain comprehensive records of maintenance activities.

    KRA6 Documentation & Reporting Keep up-to-date documentation of electrical installations, inspections, and maintenance reports. Report on equipment status, faults, and corrective actions.

    KRA7 Inventory Management Ensure adequate availability of electrical spare parts and equipment necessary for ongoing maintenance and emergency repairs.

    KRA8 Compliance with Technical Standards Ensure all electrical work is in line with industry standards and statutory requirements.

    Sourced from foundit

    Skills

    Compliance with technical standardsTroubleshootingEnergy ManagementSafety ComplianceInventory ManagementPreventive Maintenance

    About Aditya Birla Group

    Aditya Birla Group logo

    Aditya Birla Group

    Metals & Mining

    227.5k+

    employees

    1857

    169 years old

    Mumbai, Maharashtra

    India

    About

    Aditya Birla Group is a Fortune 500 global conglomerate. The company's businesses have grown into global powerhouses in a wide range of sectors metals, textiles, carbon black, telecom and cement.

    Industries

    Metals & MiningFinancial ServicesBuilding MaterialRetailTelecomChemicals

    Employee ratings

    2,383 reviews

    4.1/ 5

    Culture

    3.9

    Career growth

    3.5

    Work-life

    4.0

    Employees rate it well for

    Work Culture191Salary167Senior Management152Work Life Balance146Job Security123

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Electrical Engineer jobs in India

    Career guides

    • Best Auto-Apply Tools for Naukri (2026): 7 Compared on Safety, Daily Limits and Price
    • LazyApply vs LoopCV vs Sonara vs myjobb: best auto-apply tool for India (2026)
    • Can One AI Tool Apply on Naukri and LinkedIn Together? What Actually Works in 2026

    All career guidesAll articlesBrowse companies hiring

    SSH Electrical · waiting for your command