1. Home
  2. Jobs
  3. FLO-Power Plant (JB 11)
Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 24683472

    Aditya Birla Group logo

    FLO-Power Plant (JB 11)

    Aditya Birla Group · Harihar · onsite · Posted today

    Not disclosedFresherfulltimeSourced fromFoundit

    About a minute. You'll make an account on the way through.

    About this role

    Job Description

    Job Purpose

    Organize, implement and monitor Power Plant Maintenance to improve the reliability & availability of mechanical equipment to achieve targeted Production with Zero quality losses, Delivery & Environmental losses, ensuring compliance to safety, environmental & Indian Boiler Regulation (IBR) norms.

    Job Context & Major Challenges

    Job Context
    Harihar Polyfibers was started in 1972 with 100 TPD production using indigenous machinery and technology. This is the only integrated Pulp & Fibre units in the business, which demands for continuous availability of Pulp for our Fibre plant. Currently plant is operating at 210 TPD production.

    Steam & Power generated and distributed from the Captive Power Plant is a key factor for quality & throughput in continuous pulp production process. Hence maintaining an uninterrupted supply of steam/power is an essential requirement for the CPP. Over period of time, there has been technological upgradations/modifications in TG Set & Recovery Boiler which has led to stringent operation & maintenance requirements. The Captive Power Plant works with High pressure Recovery Boiler & TG set, which are critical equipment subject to stringent legal, safety and environmental requirements.

    Hence CPP operations cater to plant requirements in a demanding scenario.

    Major Challenges
    . Sustain Power Plant equipment availability under highly corrosive environment
    . Maintenance actions to increase uptime of old machinery to sustain production levels
    . Continued development/indigenization of imported equipment parts & spares
    . Due to intensive manual operations it's a challenge to ensure safety of employees

    Key Result Areas

    KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
    KRA1Maintenance

    Managing day to day maintenance activities
    . Organize & control daily maintenance activities of Power Plant equipment to ensure the availability of all equipment.
    . Coordinate Preventive Maintenance / breakdown maintenance / stoppage with operations
    . Prepare & Implement Standard Maintenance Procedures (SMP) for all equipment.
    . Prepare & Monitor Equipment Maintenance Plan (PM schedules & Lubrication schedules)
    . Analyse & take actions based on Predictive / Preventive maintenance trends
    . Ensure Spares and Assembly Preparation
    . Integrate Maintenance activities with Condition monitoring and Planning Cell
    KRA2Cost Optimization
    To initiate cost reduction plan/measures.
    . Control overtime & initiate corrective actions to minimize overtime
    . Perform Life Value analysis for design and Material of Construction Change & implement actions
    . Improve productivity by eliminating Non Value Adding activities & wastages in the section.
    . Monitor SOP compliance to avoid equipment stoppage/breakdown
    . Implement cost effective practically applicable budget schemes to ensure Work services are met.
    KRA3Spares Management. Ensure optimum availability of spares & consumables
    . Execute inspection of equipment / spares periodically
    . Coordinate for localization of high value & high lead time OEM spares by interacting with vendors
    . Develop sub component drawings and specifications
    . Monitor & ensure sub assembly inter-changeability for continuous availability of equipment
    KRA4Continuous Improvement ProjectsImplement the proposed projects ensuring that all SOPs are followed
    KRA5Ensure Safety & Environment Compliance. Implement improvement actions to reduce pollution at source
    . Implement safety standards in section as per unit safety guidelines in accordance with PSAP
    . Implement & close the safety & environment audit observations
    . Follow environmental standards for smooth plant operations
    . Ensure proper handling of hazardous chemicals
    . Ensure immediate rectification in case of abnormalities
    . Implement processes for energy saving & resource conservation
    . Implement & monitor energy efficient products and services.
    KRA6System Implementation. Implementation of QMS, EMS, EnMS & OHSMS
    . Implementation of departmental objectives & targets
    . Implementation of SAP activities

    Sourced from foundit

    Skills

    SafetyenvironmentDCSshift managementSteam SystemsBoiler OperationsPower plant operationsSteam Turbines

    About Aditya Birla Group

    Aditya Birla Group logo

    Aditya Birla Group

    Metals & Mining

    227.5k+

    employees

    1857

    169 years old

    Mumbai, Maharashtra

    India

    About

    Aditya Birla Group is a Fortune 500 global conglomerate. The company's businesses have grown into global powerhouses in a wide range of sectors metals, textiles, carbon black, telecom and cement.

    Industries

    Metals & MiningFinancial ServicesBuilding MaterialRetailTelecomChemicals

    Employee ratings

    2,383 reviews

    4.1/ 5

    Culture

    3.9

    Career growth

    3.5

    Work-life

    4.0

    Employees rate it well for

    Work Culture191Salary167Senior Management152Work Life Balance146Job Security123

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Career guides

    • The 11 best resume builders in India (2026), ranked honestly
    • Best Auto-Apply Tools for Naukri (2026): 7 Compared on Safety, Daily Limits and Price
    • myjobb vs JobRight (2026): we tested both for India

    All career guidesAll articlesBrowse companies hiring

    FLO-Power Plant (JB 11) · waiting for your command