Walk-in || Hvac Site Engineer
Mark Air- Particulate Control Systems · Chennai · hybrid · Posted 51d ago
About a minute. You'll make an account on the way through.
About this role
PROJECT ENGINEERS RESPONSIBILITIES
Understanding the purchase order (PO)
Execute the project as per plan
Site actual measurements taken from customer place
Material Requirement (MR) list preparation
Inspection at supplier place (for AHU, Ducting only)
Pre planning schedule preparation
Design qualification for clean room preparation
Work schedule preparation for each project
MR List & Fabrication materials follow up to production and stores
Materials inspection will be done before dispatch
Inspection report send within 2hours to production and stores for rectification
Receiving the material at site
Installation qualification preparation
Time keep up for site works
Contractor follow up
Unloading arrangements at site
Materials verification at site before start the work
Reporting to stores if materials short supply
Signature get from customer in the DC for received materials
Drawing clarifications given to contractors at the time of installation
Arrange boarding and lodging for contractors
Communication with customer regarding the project works
Monitoring and supervising site activities
Daily work status report send to project coordinator and management by email
Site meeting conduct with contractors
Site documents maintaining (Like schedule, planning, MR List, Drawings, PO, RM List, AC&AHU
Commissioning report, Daily call report etc)
Project status report send to validation team 4days before for testing
Project handover
Performance qualification get from validation team
Send all the reports to customer after handover
Final/Actual quantity send to admin for invoice/billing through project coordinator
Get installation report from all contractors for payment processing
Materials arrangement at site through stores
Improvement report given to project coordinator
Project analysis report preparation
Meeting conduct with other departments
Co-operate for corrective actions for delayed project
Advance amount settlement as weekly basis
Ticket booking for outstation works
Excess materials return back to stores by logistic or parcel service
Perks & Benfits:
- Privident Fund
- ESIC
- Project Incentive
Sourced from naukri