Walk-in || Head PPC CED Plant
Ameya Finishing Solution · Not specified · onsite · Posted 58d ago
₹8.0L - ₹9.0L PA6–8 yrsfulltimeSourced from
About a minute. You'll make an account on the way through.
About this role
Role & responsibilities
Key Responsibilities of a PPC Head in CED Coating
- Production Scheduling: Aligning the coating line schedule with customer demands, assembly timelines, and dispatch targets.
- Process Flow Optimization: Coordinating material movement from pretreatment stages straight through the electro-deposition tanks and curing ovens without bottlenecks.
- Inventory Management: Monitoring raw material levels such as paint chemicals, demineralized water, and phosphating agents to prevent downtime.
- Capacity Utilization: Balancing line loading, batch sizes, and jig/fixture arrangements to maximize plant output and efficiency.
- Cross-Functional Coordination: Working closely with quality control (QC), maintenance, and shop-floor supervisors to meet strict automotive or industrial standards.
Preferred candidate profile
Candidate must have thorough knowledge of the process, Manpower handling and utilization. He must work as a Team leader and maintain a good level of coordination between the entire teams like production/ process/ quality/ logistics/ maintenance.
He must be result oriented, innovative, positive on accepting challenges
Sourced from naukri
Skills
Plant OperationsOperation Maintenance