Senior Engineer - Planning
Hilite Group · Not specified · onsite · Posted today
About a minute. You'll make an account on the way through.
About this role
Technical scope and responsibilities :
• Develop coded project WBS, activity dictionaries and schedule levels (executive milestones through detailed contractor/discipline activities) tied to measurable physical scope.
Build an integrated Primavera P6 master schedule covering design coordination, statutory approvals, tendering, vendor onboarding, piling, substructure, floor-by-floor RCC cycles, faade, MEP, finishes, amenities, commissioning and handover.
• Apply realistic construction logic, calendars, constraints and productivity assumptions; verify critical/near-critical paths, activity float, dependencies and interface milestones.
• Develop floor-cycle plans, zones/work fronts, resource and manpower histograms, equipment requirements and a phased logistics/long-lead procurement programme.
• Coordinate with the QS to map BOQ quantities and budget values to schedule activities for physical progress measurement, planned value, S-curves and project cash-flow forecasting.
• Obtain and integrate consultant deliverable dates, drawing review/approval cycles, vendor fabrication lead times, site constraints and inspection/approval milestones.
• Establish baseline-control protocols; maintain versions, progress cut-off dates, look-ahead plans (2/4/6 weeks), actual starts/finishes and auditable progress evidence.
• Prepare weekly and monthly variance analysis, slippage summaries, schedule-risk registers, root cause analysis and achievable mitigation/recovery plans.
• Support EVM indicators, physical versus financial progress, procurement trackers, executive dashboards and schedule impact assessment for changes.
• Coordinate progress data with site and contractor engineers and challenge unsupported percentages or unrealistic completion forecasts. Essential skills and standards •
Advanced Primavera P6: activity logic, baselines, layouts, calendars, critical path analysis, updating and reporting; MS Project working knowledge.
• Advanced Excel; practical Power BI skills desirable for S-curves, KPI reporting and dashboards.
• Good understanding of high-rise construction methods, floor-cycle productivity, scheduling of MEP and finishing work fronts, and contractor programme review.
• Understanding of schedule quality, look-ahead/constraint planning, progress measurement rules, earned value and change-control procedures.
Sourced from naukri
Skills
About HiLITE Group

Hilite Group
Real Estate
1.0k+
employees
1996
30 years old
Calicut, Kerala
IN
₹4.7L PA avg
Avg at HiLITE Group
About
Industries
Employee ratings
3 reviews
Culture
5.0
Career growth
4.7
Work-life
4.3
Employees rate it well for
Find them on