1. Home
  2. Jobs
  3. Jobs in Mumbai
  4. Mechanical Engineer jobs in Mumbai
  5. Quality Engineer
Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 23991512

    Avant Heritage-iii Realty logo

    Quality Engineer

    Avant Heritage-iii Realty · Mumbai · onsite · Posted 4d ago

    ₹5.0L - ₹8.0L PA4–7 yrsfulltimeSourced fromNaukri

    About a minute. You'll make an account on the way through.

    About this role

    Avant Group (www.avantinfra.com) is looking for an experienced QA/QC Engineer.


    Location: Jogeshwari East


    Job Role:

    1. Verifying implementation of IMS (Integrated Management System) at Site

    Organize, implement, conduct, and manage the Integrated Management System (IMS) in alignment with company policies, contract specifications, and ISO 9001:2015 standards.

    2. Training and Motivation of skilled workers / unskilled workers

    Motivate and train personnel involved in the effective implementation of the approved work statements, ensuring a well-informed and skilled workforce. (Both on site and in Office)

    3. Continuous Improvement

    Monitor and verify the implementation of Quality Heads Instructions daily to identify areas for improvement and implement necessary changes to enhance quality and efficiency. (Both on site and in Office)

    4. Project-Specific Procedures

    • Day to Day Testing as per ITP Plan
    • Day to Day Activity Inspections (Pre activity, during activity, post-activity)
    • Daily/Weekly/Monthly Quality Reports Preparation on time.
    • Raising Good Quality and Bad Quality issues., and close-out follow up.
    • Implementing Preventive measures on bad quality points.
    • Incoming materials inspections
    • Weekly Quality Tool Box talks to workers

    5. Quality Laboratory Equipment Maintenance

    Ensure the optimal utilization, calibration, repair, and maintenance of measurement and testing equipment, maintaining their accuracy and reliability.

    6. Corrective and Preventive Actions

    Coordinate and oversee the timely completion of corrective and preventive actions in response to Non-Conformance Reports (NCRs), Corrective Action Requests (CARs), and customer complaints, ensuring that issues are resolved satisfactorily.

    7. Non-Conformance Management

    Maintain records of internal non-conformances and conduct follow-up activities to ensure that effective corrective and preventive actions are taken to prevent recurrences.

    8. Documentation and Compliance

    Collaborate with project management to ensure the proper documentation, maintenance, and submission of contract test packs (e.g., As-builts, O&M manuals) by IMS and contractual requirements.

    9. Quality Plan and Procedures

    Review and implement the Project Quality Plan, Inspection and Test Plan, Method Statements, and project-specific procedures to uphold the highest quality standards throughout the project.

    10. Building Handing over and Close Out.

    Must have a thorough experience of buildings handing over, List of those documents, and QA QC Responsibilities in DLP Period

    Interested candidates pls share updated resume alongwith CTC details & notice period


    Sourced from naukri

    Skills

    Material TestingQa/Qc

    See all 149 Mechanical Engineer jobs in MumbaiMechanical Engineer jobs in IndiaJobs in Mumbai

    Career guides

    • myjobb vs LoopCV (2026): which auto-apply tool should Indian job seekers pick?
    • Resume keywords for software engineers in India (with examples by role)
    • How to follow up after applying for a job in India (email templates + timing)

    All career guidesAll articlesBrowse companies hiring

    Quality Engineer · waiting for your command