Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 18767011

    MEPa2z logo

    QA/QC Manager / Engineer – Data Center Construction

    MEPa2z · Bengaluru · onsite · Posted 30d ago

    Not disclosed8–12 yrsfulltimeSourced fromFoundit

    About a minute. You'll make an account on the way through.

    About this role

    Title: QA/QC Engineer / QA/QC Manager

    Project: Data Center Project

    Location: Noida, Uttar Pradesh

    Qualification: B.E./B.Tech in Civil Engineering

    Experience:

    • 8-12 years of QA/QC experience in data center project and construction projects.
    • Proven experience in Data Center, Industrial, Warehouse, Commercial Building, or Large Infrastructure Projects.

    Preferred Candidate Profile:

    • Candidates from Tamil Nadu will be preferred.
    • Must have relevant Data Center project experience.
    • Should be currently working in or around Noida/NCR and available for site-based project execution.
    • Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
    • Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.

    Role Overview:

    We are seeking an experienced QA/QC Engineer / QA/QC Manager to lead and manage all quality assurance and quality control activities for a large-scale Data Center Project in Noida involving PEB structures, structural steel works, composite steel-concrete structures, RCC/concrete works, foundations, and associated civil works.

    The candidate will be responsible for establishing, implementing, and maintaining the project QA/QC system to ensure compliance with approved drawings, specifications, method statements, Inspection & Test Plans (ITPs), applicable standards, and client/consultant requirements.

    Key Responsibilities:

    1. Quality Assurance:

    • Prepare and implement Project Quality Plans (PQP), Inspection & Test Plans (ITPs), quality procedures, checklists, and method statements.
    • Review AFC drawings, specifications, BOQ, material specifications, and project quality requirements.
    • Establish inspection procedures for PEB, structural steel, composite structures, RCC, and civil works.
    • Coordinate with client, consultant, contractors, subcontractors, design teams, and third-party inspection agencies.
    • Ensure all materials and construction activities comply with approved specifications and applicable standards.
    • Maintain complete QA/QC documentation, inspection records, test reports, MIRs, WIRs, NCRs, and quality dossiers.

    2. PEB & Structural Steel Quality Control:

    • Inspect incoming PEB and structural steel materials including plates, sections, bolts, welding consumables, and accessories.
    • Verify Mill Test Certificates (MTCs), material grades, heat numbers, and traceability records.
    • Monitor fabrication quality including:
    • Cutting and profiling
    • Plate preparation
    • Welding
    • Dimensional control
    • Camber and alignment
    • Surface preparation
    • Painting and coating
    • Review and monitor WPS, PQR, and welder qualification records.
    • Coordinate and review NDT activities such as UT, MPI, and DPT.
    • Inspect high-strength bolted connections, torqueing, and installation records.
    • Monitor erection activities including alignment, plumbness, levels, bracing, stability, and connection details.
    • Verify member identification and traceability from fabrication through erection.
    • Inspect roofing, cladding, flashings, gutters, and associated PEB accessories.

    3. Composite Structure Quality Control:

    • Inspect composite beams, deck sheets, shear connectors/studs, and associated structural steel components.
    • Verify deck profile, thickness, fixing arrangements, and end laps.
    • Inspect shear stud welding quality, spacing, positioning, and testing.
    • Verify reinforcement placement over metal decking.
    • Check temporary supports and shoring before concrete placement.
    • Monitor concrete pouring, slab thickness, levels, curing, and finishing.
    • Verify openings, embedded items, sleeves, and MEP coordination prior to concrete placement.

    4. RCC / Concrete Quality Control:

    • Inspect reinforcement for:
    • Grade and diameter
    • Bar bending schedules
    • Spacing and positioning
    • Lap lengths
    • Development lengths
    • Anchorage
    • Concrete cover
    • Chairs and spacers
    • Inspect formwork for dimensions, stability, line, level, plumbness, and cleanliness.
    • Conduct pre-pour inspections and obtain necessary approvals.
    • Monitor concrete batching, transportation, placing, vibration, finishing, and curing.
    • Verify concrete grade, slump, temperature, and cube sampling requirements.
    • Coordinate laboratory testing and compressive strength evaluations.
    • Inspect foundations, pedestals, columns, beams, slabs, and other RCC elements.
    • Verify construction joints, expansion joints, water stops, and embedded items.
    • Monitor repairs of honeycombing, cracks, and other defects as per approved procedures.

    5. Material Inspection & Testing:

    • Prepare and submit Material Inspection Requests (MIRs).
    • Verify all materials against approved material submittals.
    • Maintain material traceability from receipt through installation.
    • Control and segregate non-conforming materials.
    • Coordinate third-party laboratory testing and inspections.

    6. Inspection & Documentation Control:

    Maintain and control records for:

    • MIR – Material Inspection Requests
    • WIR – Work Inspection Requests
    • RFI – Requests for Inspection / Information
    • Inspection & Test Plans (ITPs)
    • Method Statements
    • Concrete Pour Cards
    • Slump Test Reports
    • Cube Test Reports
    • Rebar Inspection Reports
    • Welding Inspection Reports
    • NDT Reports
    • Bolt Torque Reports
    • Coating / DFT Reports
    • Survey & Alignment Reports
    • PEB Erection Inspection Records
    • NCR/CAR Records
    • Final Quality Dossiers

    7. NCR Management & Corrective Actions:

    • Identify quality deviations and issue NCRs.
    • Conduct root-cause analysis for recurring issues.
    • Develop and monitor Corrective and Preventive Action (CAPA) plans.
    • Ensure timely NCR closure with supporting documentation.
    • Maintain quality observation registers and punch-point records.
    • Conduct periodic audits of subcontractors and vendors.

    8. Site Coordination & Reporting:

    • Attend daily and weekly quality meetings with client, consultants, and stakeholders.
    • Coordinate with construction, engineering, planning, procurement, and subcontractor teams.
    • Ensure inspections are completed prior to commencement of subsequent activities.
    • Monitor subcontractor QA/QC performance.
    • Conduct quality awareness programs and toolbox talks.
    • Ensure latest approved drawings and revisions are available at site.
    • Support preparation of as-built drawings and final handover documentation.
    • Prepare weekly and monthly QA/QC reports.

    Required Qualifications & Experience:

    • B.E./B.Tech in Civil Engineering.
    • 8-12 years of QA/QC experience in construction projects.
    • Mandatory experience in Data Center Projects.
    • Strong expertise in PEB/Structural Steel and RCC/Concrete Works.
    • Experience in welding inspection, NDT coordination, material traceability, and quality documentation.
    • Exposure to industrial, warehouse, commercial, or large infrastructure projects is preferred.
    • Experience handling client and consultant inspections.
    • Exposure to third-party inspections and testing agencies.
    • Candidates currently working in Noida/NCR will be preferred.
    • Candidates from Tamil Nadu are encouraged to apply.

    Preferred Certifications:

    • ISO 9001
    • CSWIP / AWS
    • Welding Inspector Certification
    • NDT Level II

    Sourced from foundit

    Skills

    Construction ManagementconstructionQuality AuditingData Center ConstructionQuality AssuranceQuality ControlMEPData CenterSite ExecutionCivil Engineering

    About MEPa2z

    MEPa2z logo

    MEPa2z

    About

    MEPa2z is a leading training institute focused on building services and energy, offering specialized courses in MEP systems and renewable energy.

    Find them on

    WebsiteAmbitionBox reviews

    QA/QC Manager / Engineer – Data Center Construction · waiting for your command