Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 11090172

    Recuiter logo

    Production Incharge

    Recuiter · Ludhiana · onsite · Posted 70d ago

    Undisclosed5–10 yrsfulltimeSourced fromNaukri

    About a minute. You'll make an account on the way through.

    About this role

    • MANPOWER MANAGEMENT & MANPOWER COST (MAIN FOCUS)
    • Decide the right number of workers needed for each machine and each line to meet the daily target not more, not less.
    • Reduce the number of workers used per shift wherever possible, without reducing production.
    • Track manpower cost every day and compare it to production output
    • the goal is maximum output per worker, at the lowest manpower cost.
    • Cut overtime hours by planning and managing manpower better.
    • Work towards removing the night shift completely, by making day and evening shifts efficient enough to cover the full target.
    • Train workers to handle more than one machine or job, so fewer workers can run more stations.
    • Remove unnecessary manpower stages
    • any point in the process where extra workers are placed but not adding real value.
    • Handle attendance, shift roster, and daily manpower deployment across the shop floor.
    • Train supervisors and line in-charges to run their line independently, with the least number of workers, without dropping output or quality.
    • PRODUCTION PLANNING
    • Make the daily, weekly, and monthly production plan for press shop, pipe bending, welding, and fabrication.
    • Make sure material planning is done on time
    • no line should stop because material was not ready.
    • Set the priority of jobs (which order to run) based on customer requirement and dispatch plan.
    • Break the plan into hour-by-hour targets for each machine, not just a shift-end number.
    • LINE BALANCING & EFFICIENCY
    • Balance manpower and machines on each line so that no worker or machine sits idle.
    • Remove bottlenecks that slow down the full line.
    • Find out why night shifts and low-efficiency shifts are happening, and fix the reason permanently.
    • PRODUCTION COST REDUCTION
    • Reduce cost per part, with manpower cost as the main lever.
    • Reduce scrap, rework, and rejection through better process discipline.
    • Find and implement cost-saving ideas on the shop floor
    • consumables, power, tooling, changeover time.
    • DAILY REPORTING
    • Give hourly production reports for every machine
    • output against target.
    • Give daily downtime reports
    • which machine stopped, for how long, and why.
    • Give breakdown reports
    • when it happened, when it was fixed, and the reason.
    • Reports should be quick and clear, so problems are caught the same shift, not the next day.
    • KAIZEN (CONTINUOUS IMPROVEMENT)
    • Run regular Kaizen activities on the floor to improve cycle time, layout, and material flow.
    • Keep a simple running list of improvements raised and closed.
    • PROBLEM SOLVING
    • Walk the shop floor daily to catch problems that reports may not show
    • idle time, small stoppages, wasted movement.
    • Find the root cause of repeat problems (breakdowns, low-efficiency shifts, rejections) and fix them permanently, not temporarily.
    • Inform the Plant Head about any issue that needs support beyond the shop floor.

    Sourced from naukri

    Skills

    Shop FloorMaterial PlanningKaizenLine balancingWeldingbendingCost ReductionPress ShopProduction InchargedeploymentProduction PlanningFabricationdispatch

    Production Incharge · waiting for your command