PM/ APM/Sr / Electrical Engineer - Data Center - Construction
private eye private limited · Hyderabad · onsite · Posted 62d ago
About a minute. You'll make an account on the way through.
About this role
We are looking for Electrical Engineer for Data Center Projects.
- Electrical Engineer - 4 Opening
- Project Manager - 1 Opening
- Assistant Project Manager - 2 Opening
- Sr. Electrical Engineer - 2 Opening
Location: Hyderabad
We are seeking a skilled and motivated PM/ APM/Sr / Electrical Engineer - Data Center - Construction project with a strong background in construction and site execution. The ideal candidate will have hands-on experience in Electrical Installation Works across Commercial, Residential, and IT Building projects. The role requires site-based project execution, coordination with clients, contractors, and internal teams to ensure timely and quality project delivery.
Key Responsibilities:
• Supervise and execute electrical installation works such as:
• Cable laying (Power & Control)Cable tray installation LT / HT Panel installation and termination
• Conduit and wiring work (Light, Power, and DB circuits)
• Lighting fixture installation and testing
• Review and interpret electrical drawings, BOQs, and specifications.
• Plan daily and weekly site activities, manpower, and materials.
• Coordinate with subcontractors for timely work execution.
• Conduct quality inspections, testing, and commissioning of electrical systems
• Ensure adherence to safety and quality standards at site.
• Prepare and maintain daily progress reports, material records, and work checklists.
• Support Project Manager in billing documentation and material reconciliation.
Candidate Requirements:
• Knowledge of electrical installation standards.
• Familiarity with cable sizing, load distribution and panel connections.
• Hands-on experience with AutoCAD drawings, MS Office, and site reporting.
• Should be able to read and understand electrical drawings.
• Data center environment experience is preferred
Sourced from foundit
Skills
About Private Eye

private eye private limited
1988
38 years old
Bengaluru, Karnataka
India
₹4.9L PA avg
Avg at Private Eye
About
Industries
Employee ratings
10 reviews
Culture
3.9
Career growth
3.7
Work-life
4.0
Employees rate it well for
Find them on