    PLANNING ENGINEER/MANAGER

    JOB DESCRIPTION PLANNING ENGINEER / PLANNING MANAGER

    Position Title: Planning Engineer / Planning Manager
    Department / Function: Project Planning & Controls
    Cadre: Asst. Manager to Manager Grade

    Experience: 8 to 15years
    Position Reports To: Planning Head / Project Manager / Cluster Project Manager, as applicable

    1. Job Purpose

    To plan, monitor, control and coordinate project activities to ensure timely completion within the approved project schedule, budget and contractual requirements. The role is responsible for developing project schedules, resource and milestone plans, monitoring physical and financial progress, identifying delays and deviations, analysing variations, coordinating with internal and external stakeholders, and facilitating corrective actions for effective project delivery.

    The position also supports contract administration, client billing, subcontractor management, claims and variation management, MIS reporting and project close-out to ensure achievement of project objectives.

    2. Key Accountabilities and Responsibilities

    A. Project Planning and Scheduling

    • Prepare, develop and maintain detailed project schedules using Primavera P6, MS Project or other applicable planning tools.
    • Develop baseline schedules, detailed execution programmes, milestone plans and periodic look-ahead schedules in line with contractual requirements.
    • Study contract conditions, scope of work, drawings, BOQ, specifications and project execution strategy while preparing project schedules.
    • Prepare and update activity-wise, area-wise and discipline-wise schedules covering engineering, procurement, construction, testing and commissioning.
    • Develop activity sequencing, construction methodology linkages, critical path analysis and resource requirements.
    • Prepare and monitor schedule updates, revised programmes, recovery plans and catch-up schedules.
    • Identify critical activities, interfaces, constraints and potential bottlenecks affecting project milestones.
    • Ensure alignment of project schedules with contractual completion dates and approved project objectives.

    B. Resource Planning and Deployment

    • Prepare manpower, machinery, equipment, material and subcontractor resource plans in coordination with site execution teams.
    • Assess resource requirements based on project schedules, work fronts, productivity norms and execution methodology.
    • Coordinate with Site In-charges, Project Managers, Cluster and HQ teams for timely mobilisation and deployment of resources.
    • Monitor planned versus actual resource utilisation and identify gaps or underutilisation.
    • Coordinate with procurement and stores teams to align material availability with project requirements.
    • Review resource productivity and recommend corrective measures to achieve planned progress.

    C. Project Progress Monitoring and Control

    • Monitor daily, weekly and monthly physical progress against approved project schedules and milestones.
    • Track planned versus actual progress, productivity, activity-wise performance and critical path movement.
    • Identify delays, slippages, constraints and deviations and assess their impact on project completion.
    • Prepare delay analysis, variance reports and schedule impact assessments.
    • Coordinate with execution teams to identify reasons for delays and develop mitigation and recovery measures.
    • Monitor project performance through suitable progress measurement and earned value techniques, wherever applicable.
    • Ensure timely updating of project progress and relevant data in EIP and other designated project systems.
    • Follow up with responsible stakeholders for closure of pending activities and critical constraints.

    D. Project Coordination and Interface Management

    • Coordinate with Project Managers, Site In-charges, Construction, Engineering, Design, Procurement, Contracts, Commercial, Finance and other functional teams.
    • Coordinate with clients, consultants, architects, PMC and other external stakeholders for timely resolution of project-related matters.
    • Synchronise engineering, drawing approvals, material procurement, subcontracting and site execution activities.
    • Coordinate with HQ and Cluster teams for drawings, technical approvals, resources, materials and other project requirements.
    • Identify interface issues between various disciplines, agencies and project packages and facilitate timely resolution.
    • Participate in project review meetings and follow up on agreed action points.

    E. MIS, Reporting and Management Review

    • Prepare daily, weekly and monthly progress reports, project dashboards and management information system (MIS) reports.
    • Consolidate physical progress, financial performance, resource utilisation, productivity and milestone status.
    • Prepare planned versus actual progress statements and highlight critical deviations.
    • Present project performance, key risks, constraints and recovery plans during project review meetings.
    • Provide timely and accurate project information to Project Managers, Cluster and HQ for management decisions.
    • Maintain appropriate records of project schedules, progress updates, review minutes and action trackers.

    F. Financial Planning and Cost Monitoring

    • Monitor project financial performance in coordination with Commercial, Finance and Project teams.
    • Track budgeted versus actual expenditure, activity-wise costs and resource consumption.
    • Monitor the relationship between physical progress, financial progress and project billing.
    • Identify potential cost overruns, productivity losses and commercial risks and recommend corrective actions.
    • Support forecasting of project cost, cash flow and financial commitments based on the latest execution plans.
    • Review cost implications of schedule changes, variations, additional works and resource deployment.
    • Monitor budget utilisation and support project management in achieving planned financial objectives.

    G. Contract Review and Administration

    • Study and review contract documents, including scope of work, BOQ, specifications, drawings, milestones, payment terms and contractual conditions.
    • Identify key contractual obligations, deliverables, milestones, notice requirements and compliance timelines.
    • Monitor fulfilment of contractual obligations by the client, consultants, contractors and subcontractors, as applicable.
    • Track contractual milestones, extensions of time, approval requirements and other time-bound obligations.
    • Identify deviations between contractual provisions and actual project execution and highlight potential contractual risks.
    • Coordinate preparation of contractual correspondence, notices, submissions and supporting records.
    • Support contract amendments, supplementary agreements and other contractual documentation.
    • Maintain proper records of contractual communications, instructions, approvals and project events.

    H. Variation Management and Claims

    • Identify, assess and document variations, extra items, additional scope and changes in project requirements.
    • Analyse the impact of variations on project cost, schedule, resources and contractual commitments.
    • Prepare variation statements, supporting documents, rate analysis and cost impact assessments.
    • Coordinate with Project, Commercial and Contracts teams for submission and approval of variations.
    • Identify potential claims arising from delays, change in scope, additional works, client instructions and other contractual events.
    • Support preparation and submission of claims, including extension of time (EOT) claims and claims for extra works, wherever applicable.
    • Maintain records and supporting documentation for claims, notices, delay events and contractual entitlements.
    • Follow up for approval and certification of variations and claims.

    I. Client Billing and Payment Follow-up

    • Coordinate preparation and submission of customer invoices / Running Account (RA) bills in accordance with contractual provisions.
    • Ensure timely submission of measurement sheets, supporting documents and billing statements.
    • Coordinate with site teams, clients and consultants for measurement verification, certification and approval of bills.
    • Monitor billing progress, certification status, payment realisation and outstanding receivables.
    • Identify billing gaps, unbilled work and delays in certification and initiate follow-up actions.
    • Coordinate with Commercial and Finance teams for resolution of billing and payment-related issues.
    • Maintain customer billing records and support cash flow planning.

    J. Subcontractor and Agency Management

    • Coordinate identification, evaluation, finalisation and engagement of suitable subcontractors and agencies in consultation with Project, Cluster and HQ teams.
    • Support subcontractor planning and package allocation in line with project requirements and execution schedules.
    • Coordinate preparation, review and processing of subcontract work orders, amendments and related documentation.
    • Monitor subcontractor performance, progress, resource deployment and contractual compliance.
    • Coordinate subcontractor billing, measurement verification, certification and payment processing.
    • Review and reconcile customer billing against subcontractor billing to monitor commercial exposure and project margins.
    • Ensure periodic reconciliation of materials, services, manpower and other resources issued or provided to subcontractors.
    • Identify subcontractor-related delays, performance issues and commercial risks and coordinate corrective action.

    K. Material and Service Reconciliation

    • Monitor planned versus actual material and service consumption in coordination with site, stores and commercial teams.
    • Ensure periodic reconciliation of materials issued, consumed, returned and held by subcontractors.
    • Monitor material wastage, consumption norms and deviations against approved budgets.
    • Reconcile resources and services provided to subcontractors with contractual and commercial records.
    • Highlight excess consumption, unaccounted materials and potential cost exposure.
    • Coordinate corrective measures for effective resource utilisation and cost control.

    L. Risk Management and Corrective Action

    • Identify project risks, schedule constraints, resource bottlenecks and potential contractual issues.
    • Assess the impact of risks on project milestones, cost, quality and overall delivery.
    • Maintain project risk registers and follow up on mitigation actions.
    • Develop alternative execution strategies and recovery plans in consultation with project teams.
    • Escalate critical issues and delays to the Project Manager, Planning Head and Cluster management.
    • Monitor implementation and effectiveness of corrective and preventive measures.

    M. Project Close-out and Handover

    • Coordinate preparation and monitoring of project completion and close-out schedules.
    • Ensure closure of pending works, contractual deliverables, billing, variations, claims and subcontractor accounts.
    • Coordinate reconciliation and settlement of customer and subcontractor accounts.
    • Ensure completion and compilation of project records, correspondence, progress reports and contractual documentation.
    • Support preparation of final bills, final account statements and outstanding claim submissions.
    • Coordinate collection and submission of completion certificates, handover documents and other contractual records.
    • Ensure proper closure and archiving of project records in accordance with organisational requirements.

    N. Team Coordination and Continuous Improvement

    • Guide and coordinate planning engineers, planning executives and other team members, as applicable.
    • Establish effective planning, monitoring and reporting processes across project teams.
    • Promote standardisation of project schedules, progress measurement and MIS reporting.
    • Identify opportunities to improve planning accuracy, productivity, cost control and project execution.
    • Share project performance insights, lessons learned and best practices across project teams.
    • Support development of planning capabilities and effective use of project management tools.

    3. Key Performance Indicators (KPIs)

    • Timely preparation, approval and updating of baseline and detailed project schedules.
    • Achievement of contractual milestones and planned project completion targets.
    • Accuracy and timeliness of physical and financial progress monitoring.
    • Identification and timely reporting of schedule deviations and critical delays.
    • Effectiveness of recovery plans and corrective actions.
    • Accuracy of resource planning and utilisation monitoring.
    • Timely preparation and submission of MIS and project performance reports.
    • Timely identification, submission and approval of variations and claims.
    • Timely submission, certification and follow-up of customer bills.
    • Effective monitoring and reconciliation of subcontractor billing and material consumption.
    • Compliance with contractual obligations, notice requirements and documentation.
    • Timely closure of project records, final accounts and contractual deliverables.

    4. Educational Qualification

    • Full-time Engineering Graduate or Diploma in Civil / Mechanical / Electrical Engineering or other relevant engineering discipline.
    • Qualification in Construction Management, Project Management or Planning will be an added advantage.
    • Certification or training in Primavera P6, MS Project, project controls, contract management or project management tools will be an advantage.

    5. Experience

    • Relevant experience in project planning, project controls, construction management, project monitoring or contract administration in construction, infrastructure, industrial, building or EPC projects.
    • Exposure to project scheduling, progress monitoring, resource planning, MIS, cost monitoring and stakeholder coordination.
    • Experience in contract review, variation management, claims, client billing and subcontractor management will be an added advantage, depending on the role.
    • Familiarity with large-scale project execution, milestone management and multidisciplinary coordination.
    • Scope of responsibility, functional ownership and decision-making authority will be commensurate with the cadre and assigned position.

    6. Functional / Technical Competencies

    • Project planning, scheduling and monitoring.
    • Primavera P6, MS Project and other project planning tools.
    • Baseline preparation, critical path analysis, milestone planning and schedule updating.
    • Resource planning, productivity analysis and progress measurement.
    • Physical and financial progress monitoring.
    • Project MIS, dashboards and management reporting.
    • Contract review, contractual obligations and contract administration.
    • Delay analysis, variation management, claims and EOT submissions.
    • Customer billing, subcontractor billing and commercial reconciliation.
    • Cost monitoring, cash flow tracking and financial forecasting.
    • Knowledge of construction methodologies, project execution and engineering interfaces.
    • EIP and other project management / ERP systems.
    • Advanced MS Excel, PowerPoint and other reporting tools.

    7. Behavioural Competencies

    • Teamwork and collaboration.
    • Effective communication and interpersonal skills.
    • Planning, organising and time management.
    • Analytical thinking and problem-solving.
    • Decision-making and accountability.
    • Positive attitude and adaptability.
    • Creativity and continuous improvement.
    • Stakeholder management and coordination.
    • Attention to detail and accuracy.
    • Ownership, commitment and result orientation.
    • Ability to work under project deadlines and manage multiple priorities.

    8. Role Applicability

    This JD is applicable across all cadres and experience levels within the Planning and Project Controls function. The scope of responsibility, level of authority, team management and functional ownership shall be aligned with the position, cadre and project requirements.

    The role may cover one or more of the following areas based on project requirements:

    1. Project Planning and Scheduling.
    2. Project Controls and Progress Monitoring.
    3. Resource Planning and Productivity Monitoring.
    4. Financial Planning and Cost Monitoring.
    5. Contract Planning and Administration.
    6. Variation Management and Claims.
    7. Client Billing and Subcontractor Billing.
    8. MIS, Reporting and Management Review.
    9. Project Close-out and Handover.

    PRECAST ERECTION

    osition Title: Precast Erection Engineer / Precast Erection Manager
    Department / Function: Precast Project Execution / Construction
    Cadre: Applicable across all cadres
    Position Reports To: Precast Erection Manager / Project Manager / Construction Head / Project Head, as applicable

    1. Job Purpose

    To plan, coordinate, execute, monitor and deliver precast concrete erection activities at project sites in accordance with approved drawings, erection methodology, project schedules, quality standards, safety requirements and contractual specifications.

    The role involves erection planning, mobilisation of cranes and equipment, lifting and installation of precast elements, alignment, levelling, temporary stability, connection works, grouting, quality inspections and coordination with design, manufacturing, logistics and project execution teams.

    The position is responsible for ensuring safe and efficient erection of precast structural and architectural elements, achievement of project milestones, optimum utilisation of resources and compliance with approved engineering and construction requirements.

    2. Key Accountabilities and Responsibilities

    A. Precast Erection Planning and Scheduling

    • Develop and implement detailed precast erection plans in line with the overall project schedule and construction sequence.
    • Review approved precast drawings, erection layouts, structural details and project specifications before commencement of erection activities.
    • Prepare element-wise, zone-wise and floor-wise erection sequences and milestone plans.
    • Coordinate with precast manufacturing, logistics, planning and site execution teams to ensure timely availability of elements at the erection front.
    • Plan crane deployment, lifting equipment, access arrangements, work fronts and manpower requirements.
    • Identify site constraints, access limitations, sequencing issues and potential erection bottlenecks.
    • Prepare daily, weekly and monthly erection targets and monitor achievement against planned progress.
    • Develop recovery plans and alternative erection sequences wherever required.

    B. Precast Element Erection and Installation

    • Execute erection and installation of precast concrete elements as per approved drawings and erection methodology.
    • Coordinate installation of precast columns, beams, slabs, wall panels, staircases, faade panels, hollow-core slabs, boundary walls and other precast components, as applicable.
    • Ensure correct identification, orientation, positioning and placement of precast elements.
    • Monitor lifting, shifting, positioning, alignment, levelling and installation activities.
    • Ensure proper seating, bearing length, temporary support and stability of installed elements.
    • Coordinate erection activities in accordance with approved construction sequence and structural requirements.
    • Ensure that elements are handled and installed without damage during lifting, transportation and placement.
    • Monitor workmanship and ensure compliance with approved installation tolerances.

    C. Crane, Lifting and Rigging Operations

    • Plan and coordinate crane requirements based on element weight, lifting radius, height, site conditions and erection sequence.
    • Coordinate selection and deployment of mobile cranes, tower cranes, crawler cranes and other lifting equipment, as applicable.
    • Review lifting arrangements, lifting points, inserts, rigging arrangements and equipment capacity in coordination with the competent engineering team.
    • Ensure approved lifting plans and method statements are available before commencement of lifting operations.
    • Coordinate with crane operators, riggers, signalmen and lifting supervisors for safe execution.
    • Ensure proper inspection and certification of cranes, lifting tackles, accessories and equipment.
    • Monitor lifting operations and ensure compliance with approved lifting procedures and safety requirements.
    • Coordinate safe movement and positioning of equipment within the project site.

    D. Alignment, Levelling and Temporary Stability

    • Ensure accurate positioning, alignment, levelling and dimensional control of precast elements.
    • Coordinate installation of temporary supports, props, braces and other stabilisation arrangements.
    • Ensure stability of precast elements during erection and before completion of permanent connections.
    • Monitor verticality, line, level, bearing and installation tolerances.
    • Coordinate survey checks and verification of installed elements with the survey team.
    • Ensure temporary supports and bracing are removed only after confirmation of required structural stability and approval.
    • Identify and resolve installation discrepancies in consultation with design and engineering teams.

    E. Connection Works, Grouting and Joint Treatment

    • Coordinate execution of precast element connections, including bolted connections, welded connections, dowel connections, reinforcement continuity and other approved connection systems.
    • Monitor installation of connection plates, inserts, couplers, anchors, dowels and embedded components.
    • Ensure execution of joint grouting, pocket grouting, bearing grouting, sealant application and other associated activities.
    • Verify quality of connection works and ensure compliance with approved design details and specifications.
    • Coordinate concrete infilling, stitching, joint treatment and structural integration works.
    • Ensure inspection and approval of connections before proceeding with subsequent construction activities.
    • Coordinate resolution of connection-related issues with design, quality and execution teams.

    F. Drawing Review and Technical Coordination

    • Review precast erection drawings, general arrangement drawings, shop drawings, element details and installation specifications.
    • Verify element identification, dimensions, lifting inserts, connection details, erection sequence and installation requirements.
    • Coordinate with precast design, structural engineering, BIM and construction teams for clarification of technical issues.
    • Identify discrepancies between approved drawings and actual site conditions.
    • Coordinate resolution of RFIs, technical queries, design modifications and site-related constraints.
    • Ensure the latest approved drawings and revisions are available at the erection front.
    • Provide site feedback to design and manufacturing teams regarding constructability, installation and connection issues.

    G. Precast Manufacturing and Logistics Coordination

    • Coordinate with precast production teams for timely manufacturing and availability of required elements.
    • Monitor element readiness, quality clearance, identification, tagging and dispatch status.
    • Coordinate transportation, loading, unloading and delivery of precast elements to the project site.
    • Plan storage and stacking arrangements to ensure safe handling and easy accessibility during erection.
    • Ensure elements are delivered in the required sequence to avoid unnecessary shifting, handling and storage.
    • Monitor damage, shortages, dimensional discrepancies and rejection of precast elements.
    • Coordinate with production and logistics teams for timely resolution of supply and delivery constraints.

    H. Resource and Subcontractor Management

    • Plan and deploy engineers, supervisors, riggers, crane operators, technicians, skilled and unskilled manpower for erection activities.
    • Coordinate with subcontractors and specialist agencies for erection, lifting, welding, grouting and associated activities.
    • Monitor subcontractor performance, productivity, manpower deployment and adherence to erection schedules.
    • Ensure availability and utilisation of cranes, lifting equipment, tools, tackles and other resources.
    • Monitor daily productivity and identify opportunities for improvement.
    • Coordinate subcontractor measurements, work certification and billing inputs, as applicable.
    • Ensure effective coordination among multiple agencies working at the erection front.

    I. Quality Assurance and Control

    • Ensure precast erection activities are carried out in accordance with approved drawings, specifications, method statements and quality plans.
    • Conduct and coordinate inspections of precast elements before lifting and installation.
    • Verify dimensions, surface condition, embedded inserts, lifting points and identification before erection.
    • Monitor alignment, level, verticality, joint gaps, bearing arrangements and installation tolerances.
    • Coordinate inspection and approval of connections, grouting, welding and joint treatment.
    • Ensure timely documentation of inspection requests, checklists and quality records.
    • Identify non-conformities, damages and installation defects and coordinate corrective actions.
    • Ensure closure of quality observations and prevent recurrence of defects.

    J. Safety Management and Statutory Compliance

    • Ensure safe execution of all precast erection and lifting activities in compliance with project EHS requirements.
    • Ensure preparation and implementation of approved method statements, risk assessments, lifting plans and job safety analysis.
    • Monitor safe working practices during crane operations, lifting, work at height, working at edges and handling of heavy precast elements.
    • Ensure proper barricading, exclusion zones, access control and safe movement of personnel and equipment.
    • Verify availability and use of appropriate PPE, fall protection systems and safety equipment.
    • Ensure inspection and certification of cranes, lifting tackles and other equipment.
    • Coordinate toolbox talks, safety briefings and permit-to-work requirements.
    • Stop and escalate unsafe operations and ensure timely implementation of corrective measures.

    K. Progress Monitoring, Productivity and MIS

    • Monitor daily, weekly and monthly erection progress against approved targets.
    • Track number of elements manufactured, dispatched, received, erected and accepted.
    • Monitor crane utilisation, manpower productivity, equipment deployment and erection cycle time.
    • Prepare progress reports, productivity statements, resource utilisation reports and project MIS.
    • Identify reasons for delays, idle time, equipment breakdown and productivity losses.
    • Coordinate with planning and project teams for schedule updates and recovery measures.
    • Maintain records of erection activities, inspection status, element-wise installation and pending works.

    L. Coordination with Project Stakeholders

    • Coordinate with Project Managers, Construction, Planning, Design, BIM, Quality, EHS, Manufacturing, Logistics and Commercial teams.
    • Coordinate with clients, consultants, PMC representatives and other stakeholders for inspections, approvals and resolution of site issues.
    • Participate in project review meetings and provide updates on erection progress, constraints and resource requirements.
    • Ensure timely communication of technical, operational and safety-related issues.
    • Coordinate interfaces between precast erection and other civil, structural, architectural and MEP activities.

    M. Project Close-out and Handover

    • Ensure completion of all precast erection activities in accordance with approved project requirements.
    • Coordinate rectification of pending installation defects, alignment issues, connection observations and punch points.
    • Ensure completion of grouting, joint treatment, finishing and associated activities.
    • Prepare and maintain element-wise erection records, inspection reports and as-built documentation.
    • Coordinate final inspections and obtain necessary approvals from client and consultants.
    • Ensure proper handover of completed precast structures and related records to the project team.
    • Support project close-out and documentation of lessons learned.

    N. Team Management and Continuous Improvement

    • Guide and coordinate engineers, supervisors, technicians, riggers and other site personnel, as applicable.
    • Ensure clear allocation of responsibilities and effective coordination among erection teams.
    • Monitor team performance, productivity and compliance with project procedures.
    • Identify opportunities to improve erection methodology, cycle time, crane utilisation and resource productivity.
    • Promote safe working practices, technical learning and continuous improvement.
    • Support standardisation of erection procedures and adoption of improved construction techniques.

    3. Key Performance Indicators (KPIs)

    • Achievement of planned precast erection targets and project milestones.
    • Productivity measured through elements erected per shift / day / week, as applicable.
    • Compliance with approved erection sequence, drawings and installation tolerances.
    • Effective crane utilisation and optimisation of lifting operations.
    • Reduction in element damage, rework and installation defects.
    • Timely completion of connection, grouting and joint treatment activities.
    • Effective manpower and subcontractor productivity.
    • Compliance with EHS requirements and safe lifting practices.
    • Timely closure of quality observations and inspection requirements.
    • Effective coordination with manufacturing, logistics and project execution teams.
    • Timely submission of progress reports, inspection records and erection documentation.
    • Successful completion and handover of precast erection works.

    4. Educational Qualification

    • Full-time Diploma or Degree in Civil Engineering.
    • Qualification in Structural Engineering or Construction Management will be an added advantage.
    • Specialised training or certification in precast construction, lifting and rigging, crane operations, temporary works or construction safety will be beneficial.

    5. Experience

    • Relevant experience in precast concrete construction, erection, installation, site execution or structural construction activities.
    • Exposure to erection of precast columns, beams, slabs, wall panels, faade panels, staircases and other precast components, as applicable.
    • Experience in crane operations, lifting and rigging coordination, alignment, levelling, temporary stability and connection works.
    • Exposure to precast manufacturing, logistics, design coordination, quality control and project planning will be an added advantage.
    • Experience in high-rise buildings, residential, commercial, industrial, infrastructure or large-scale EPC projects will be relevant.
    • Scope of responsibility, technical ownership, decision-making authority and team management shall be commensurate with the cadre and assigned position.

    6. Functional / Technical Competencies

    • Knowledge of precast concrete construction methodology and erection practices.
    • Understanding of structural drawings, precast shop drawings, erection layouts and connection details.
    • Knowledge of precast element handling, transportation, lifting, installation and sequencing.
    • Crane selection, lifting plans, rigging arrangements and lifting equipment requirements.
    • Knowledge of alignment, levelling, survey checks, tolerances and temporary stability.
    • Understanding of bolted, welded, dowel, grouted and other precast connection systems.
    • Knowledge of joint grouting, concrete infilling, stitching and sealant applications.
    • Understanding of method statements, risk assessments, inspection and test plans.
    • Knowledge of quality assurance, safety requirements and statutory compliance.
    • Familiarity with AutoCAD, Revit, Navisworks, MS Project, Primavera P6 and MS Office, as applicable.
    • Knowledge of productivity monitoring, resource planning and project reporting.
    • Ability to coordinate with design, manufacturing, logistics and site execution teams.

    7. Behavioural Competencies

    • Teamwork and collaboration.
    • Effective communication and interpersonal skills.
    • Planning, organising and time management.
    • Ownership and accountability.
    • Problem-solving and decision-making.
    • Positive thinking and adaptability.
    • Leadership and team coordination.
    • Safety consciousness and quality orientation.
    • Attention to detail and execution discipline.
    • Ability to work under project deadlines and challenging site conditions.
    • Result orientation and continuous improvement.

    8. Role Applicability

    This JD is applicable across all cadres and experience levels within Precast Erection. The scope of responsibility, level of authority, team management and functional ownership shall be aligned with the position, cadre and project requirements.

    The role may cover one or more of the following precast erection activities based on project requirements:

    1. Structural Precast Erection – Columns, beams, slabs, wall panels and structural components.
    2. Architectural Precast Erection – Faade panels, cladding, architectural elements and external wall systems.
    3. Precast Floor Systems – Hollow-core slabs, solid slabs, staircases and associated components.
    4. Crane and Lifting Operations – Crane planning, rigging, lifting and installation.
    5. Connection and Joint Works – Bolting, welding, grouting, stitching and joint treatment.
    6. Erection Planning and Coordination – Sequencing, resource planning, logistics and progress monitoring.
    7. Quality and Safety – Inspection, installation compliance, lifting safety and erection quality.

    Sourced from naukri

    Skills

    Quantity EstimationBilling EngineeringSub Contractor BillingEstimation EngineeringHigh Rise BuildingResidentialPlanning EngineeringQuantity SurveyingCivil Engineering

    About Larsen & Toubro Limited

    Larsen and Toubro logo

    Larsen and Toubro

    Engineering & Construction

    59.0k+

    employees

    1938

    88 years old

    Mumbai, Maharashtra

    US

    ₹8.5L PA avg

    Avg at Larsen & Toubro Limited

    ₹14L – ₹24L PA

    This role

    About

    L&T is a major technology, engineering, construction, manufacturing and financial services conglomerate, with global operations.

    Industries

    Engineering & ConstructionDefence & AerospaceIndustrial MachineryPowerReal EstateOil & Gas

    Employee ratings

    10 reviews

    3.9/ 5

    Culture

    2.5

    Career growth

    2.4

    Work-life

    2.4

    Employees rate it well for

    Job Security40Skill Development39

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Jobs in Mumbai

    Career guides

    • How to Build a Job Application Automation in 2026: Architecture, ATS APIs and Code - and When to Buy Instead
    • How to get more interview calls from Naukri (profile + apply strategy)
    • myjobb vs AIApply (2026): which AI job application tool wins for India?

    All career guidesAll articlesBrowse companies hiring

    Planning Engineer / Planning Manager - Mumbai · waiting for your command