    Job Purpose

    To maintain the Instrumentation systems of DG ,WHRS & Solar for ensuring smooth and trouble free operation of the plant in order to produce uninterrupted power supply.

    Job Context & Major Challenges

    Andhra Pradesh Cement Works (APCW) : a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Tadipatri, District - Anantapur. APCW has 2 Lines. Line-1 was commissioned in 1998 with an installed capacity of 2 million tons (2 MTPA) cement annually, which has been enhanced to 2.7 MTPA over a period of six years through several improvements and modifications. Line-2 was commissioned in August 2008 with an installed capacity of 3.4 MTPA. The total cement production capacity of APCW, along with the associated Units, is 11 MTPA. The integrated plant is associated with two grinding units and one bulk terminal - Arakkonam Grinding Unit (ARCW) in Tamil Nadu, Ginigera Grinding Unit (GICW) in Karnataka and Shankarapalli Bulk Terminal (SBT) in Hyderabad. The unit has also established a thermal power plant of 2 X 25 MW capacity to cater the plant's power requirement.
    The APCW Mine is located near Tummalapenta Village, Kolimigundla Mandal, Kurnool District at Andhra Pradesh. It has a production capacity of 9.20 MTPA. The mine lease extents up to 844.939 hector. It was opened in the year July 1997. The general geology falls in Narji Limestone formation of Kurnool system, age of 800 Mio years old. As per UNFC classification, mine has got the limestone reserves of 181.65 Mio MT as on 31 March 2012. Winner of the prestigious National Environment FIMI Award for the year 2002-03, it is one of the largest mines producing 9.20 Mio MTPA limestone at single location.
    Upkeepment of Instrumentation equipment of DG WHRS & Solar to maintain +99.5 % uptime. 100 % uptime of DCS system.
    Location of the plant possess a challenge to get the skilled manpower and proper responses from Vendors / suppliers.

    Key Result Areas

    KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
    KRA1Plant Availability: Timley completion & implementation of maintenance activities for maximum availability from electrical and instrument department of desalination plant for achieving targets with respect to downtime, maintenance work, customer satisfaction and power availability.Troubleshooting of electrical and instrument problems to ensure proper working of desalination plant and township RO.
    Timely calibration for accuracy of field & Lab. instruments as per standards.
    Follow maintenance plans
    Timely Completion of PM schedule and jobs in shutdown.
    Review breakdowns & analysis for problems.
    Ensure power availability for continouos operation by diverting power to DG from main supply during powercut and ensure ready to start condition of Emergency DG.
    KRA2Cost Optimization: Plan, monitor and control cost (spares, Inventory & manpower) of Electrical & Instrumentation maintenance activities in desalination plant to optimize maintenance cost within the budget.Plan, monitor and control cost (spares, Inventory) of electrical and instrument maintenance activities in desalination plant to optimize maintenance cost within the budget.
    Inventory Review & Maintain Critical Spares
    Impletation of kaizen & improvement jobs for reducing cost.
    Reduce consumption by improving plant uptime
    Prepare electrical and instrument budget of Desalnation plant
    Monitor consumption with reference to budget.
    To ensure healthy condition of VFD for power optimization to achieve cost optimization.
    KRA3Continuous Improvement: Study and identify projects, coordinate and monitor implementation/up-gradation/ modification/de-bottle necking/ improvement of projects to improve the availability & reduce cost of Electrical & Instrumentation maintenance.Collection of data on failures and bottlenecks & identification of improvements projects.
    Analysis of failures.
    Identify improvement actions.
    Formulate proposal i.e., equipment specification, drawings etc.
    To Ensure Zero Fatality & Zero LTI in/due to Electrical & Instrumentation section of Desalination plant
    KRA4SHE (Safety, Health & Environment) along with Sustainability initiativesEnsuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
    Educating team about I know my job, I know the hazards associated with my job and I applied control measures & I escalate to my senior among manpower deployed in sections/department manpower including peer, WB & CL manpower
    Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system.
    To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP
    Active participation in safety training, safety sub committees, standard champions meeting and any safety event
    Ensure good housekeeping, limited use of power, no leakage of water, oil, air etc and reporting concerned if any abnormalities for corrective action
    Adhering of all safety precautions on the site and off the site
    Replicating good practice for saving environment for long run sustainability and creating awareness among manpower to save guard natural resources.
    KRA5System Management
    (Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards)
    To implement improvement project to reduce repetitive problems/breakdown or losses.
    Timely submission of Kaizen, OPL, Good to fine, suggestion on system
    Developing and sustaining Model area in respective sections
    100% active participation in respective KFA & GRT meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programmes down the level team
    To know about IMS and other systems requirement and documents for Non-Conformity in section during internal and external audits or assessments.
    Implementation of critical spares & consumable SOP without any defilement
    Identify & arrange rectification of leakage points/unsafe points along with monitor & take corrective action for emission levels.

    Sourced from foundit

    Skills

    waste heat recovery

    About Aditya Birla Group

    Aditya Birla Group logo

    Aditya Birla Group

    Metals & Mining

    227.5k+

    employees

    1857

    169 years old

    Mumbai, Maharashtra

    India

    About

    Aditya Birla Group is a Fortune 500 global conglomerate. The company's businesses have grown into global powerhouses in a wide range of sectors metals, textiles, carbon black, telecom and cement.

    Industries

    Metals & MiningFinancial ServicesBuilding MaterialRetailTelecomChemicals

    Employee ratings

    2,383 reviews

    4.1/ 5

    Culture

    3.9

    Career growth

    3.5

    Work-life

    4.0

    Employees rate it well for

    Work Culture191Salary167Senior Management152Work Life Balance146Job Security123

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    PF TPP (WHRS Instrumentation) - Engineer / Sr. Engineer / Assistant Manager · waiting for your command