Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 12114840

    Godrej Properties logo

    Mechanical Officer

    Godrej Properties · Bengaluru · onsite · Posted 66d ago

    Undisclosed3–8 yrsfulltimeSourced fromNaukri

    About a minute. You'll make an account on the way through.

    About this role


    Position Title
    Officer-MEP

    Functional Area Projects (MEP)
    Location
    Bangalore
    1. Basic Purpose of the Position
    The incumbent is responsible for managing implementation of MEP services in a project to ensure
    timeliness and quality of MEP activities. This is done through:

    tracking, monitoring and coordinating on-site activities for projects with Project Management
    Consultants/ MEP contractors


    ¢
    driving adherence to the project plans, product design and quality norms
    timely resolution of issues
    implementation of all quality and safety initiatives at given location
    2. Role Responsibilities
    Responsibility
    Area
    Indicative Performance
    Key Activities
    Measures
    Financial / Strategy
    Tracks spends against allocated project budget
    Develops a cost effective plan for the MEP part of
    infrastructure [Quality services within budgets] Revises costs
    as per the requirements through a joint discussion with AVP
    Projects & GM Design, sends to HO for final sign off
    Optimization
    construction cost
    of
    1. Project Budget
    Tracking
    Certifies the bills of consultants
    Follows up with Contacts and Accounts to ensure that the
    payments to consultants are made in a timely manner
    2. Bills and
    Payments
    Timely payments to
    consultants
    Operational
    Prepares Requests for Proposals for services that need to be
    outsourced locally such as electrical, plumbing, mechanical,
    escalators etc
    Identifies suitable vendors for various contracts
    Conducts a comparative analysis of shortlisted vendors and
    makes recommendations
    Provides technical/work scope inputs to Contractors to
    prepare the contract
    1. Selection of
    Consultants/
    vendors
    Timely selection of
    consultants
    Follows up with Contractors for sign off on the agreement /
    Letter of Intent (LOI)/work order



    Provides inputs on Services design (MEP) to Design team at
    concept design stage
    Evaluates drawings submitted by consultants to ensure
    drawings are as per design brief and in compliance with
    necessary statutory requirements for MEP works
    ¢
    ¢
    Timeliness
    Comprehensiveness
    of planning
    2. Project
    Planning
    Prepares detailed project plan for the project basis the
    Responsibility
    Area
    Indicative Performance
    Measures
    Key Activities
    macro plan prepared by regional head in coordination with the
    project management consultants
    ¢
    Conducts weekly review meetings with Contractors / Project
    Management consultants on work progress, construction
    schedule, design or quality issues
    3. Coordination
    with Project
    Management
    Consultants/
    Contractors
    Project activities as
    per schedule
    ¢
    ¢
    Identifies issues hampering project progress
    Resolves technical differences of opinion (or deviations)
    between consultants and contractors, if any
    ¢
    Follows up with the project management consultant on
    schedule of materials required
    ¢
    ¢
    Coordinates with Contracts for fulfillment of material
    requirements for first class items
    4. Material
    Timely availability
    of material
    Procurement
    Coordinates with Design and Regional Head on selection of
    fittings (if required)
    ¢
    ¢
    ¢
    Tracks and monitors progress of MEP activities with respect
    to final drawings, design, construction schedule and budget
    ¢
    Adherence
    design Adherence
    to
    schedule
    Adherence to
    Quality standards
    Adherence to safety
    standards and
    norms
    to
    planned
    Monitor installation ,Commissioning, Testing , performance
    trials of equipment such as HVAC , Escalators
    5. Project
    Tracking
    ¢
    ¢
    Monitors quality of work by conducting inspections on a
    regular basis and scrutinizing reports from PMC consultants
    ¢
    ¢
    Prepares monthly report on Project updates
    Provides project updates to Accounts and Sales team for
    generation of customer bills
    6. MIS
    Reporting
    &
    Timeliness
    accuracy of reports
    and
    Liaisons with Local statutory bodies for power, switches water
    supply, etc. for approvals for the GGC townships
    7. Liaison with
    statutory
    bodies
    Process



    1. Process
    Adherence
    ¢
    ¢
    Complies with company defined guidelines and processes
    Adheres to project timelines
    % Process
    compliance
    ¢
    ¢
    ¢
    Identifies processes/procedures in own work area that need
    improvement
    Recommends process improvement ideas to streamline
    efficiency/costs/productivity
    ¢
    ¢
    Initiatives taken
    Impact of process
    improvement ideas
    2. Process
    Improvement
    Undertakes process improvement activities in own work area
    People Management and Development
    ¢
    ¢
    Identifies self development needs
    Takes concrete steps to pursue self development through
    training, education, projects etc.
    Learning
    Development
    and
    New skills acquired
    3. Working Relationships (Internal And External)
    Internal Interfaces
    Purpose of Interaction
    Design (Regional & HO) Recommendations for concept drawings
    Liaison
    Advisor related to Govt. regulations
    Tracking project timelines
    Project status
    Operations
    Marketing
    Finance
    Cost saving, budgeting
    Project completion
    Sales
    External Interfaces
    Consultants
    Government Officials
    Contractors
    Purpose of Interaction
    Liaison for deviation in concept designs
    Negotiations for approvals
    Project status, timelines
    4. Decision Making Authorities
    ¢
    Local consultant fees are signed off by the regional office basis incumbent's
    recommendations
    1. Functional
    2. Financial
    ¢
    Sign-off from HO not required for MEP
    Nil
    5. Position Specifications (Know-How, Skills and Knowledge for this position)
    Current Incumbents
    Education
    Bachelors degree in Electrical Engineering, with 10.2 years of experience in
    Qualification &
    Experience
    handling projects
    Threshold Education BE Mech/Electrical Engg 5-8 years of experience in construction industry as MEP
    Qualification &
    Experience
    project manager. Experience in managing consultants and contractors in order to
    complete goals, objectives and schedules.



    ¢
    ¢
    Understanding of the real estate development business
    Knowledge of MEP services such as Electrical equipment, fire fighting system,
    plumbing, escalatora etc
    Functional/
    Technical
    competencies
    ¢
    ¢
    ¢
    Construction management
    Project Management
    Knowledge of latest technologies and materials related to MEP
    Project
    MS


    Sourced from naukri

    Skills

    Fire Protection SystemFire Fighting SystemHigh Rise ResidentialPlumbing

    About Godrej Properties

    Godrej Properties logo

    Godrej Properties

    Real Estate

    4.2k+

    employees

    1990

    36 years old

    Mumbai, Maharashtra

    India

    About

    Godrej Properties has been instrumental in the construction of Residential, commercial and township projects such as Real Estates in Mumbai, Flat in Kolkata, Flat In Noida etc.

    Industries

    Real Estate

    Employee ratings

    1,854 reviews

    3.6/ 5

    Culture

    3.5

    Career growth

    3.0

    Work-life

    3.4

    Employees rate it well for

    Work Life Balance234Work Culture196Salary160Senior Management116Office Politics87

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Mechanical Officer · waiting for your command