- PRINCIPAL ACCOUNTABILITIES
- Monitor the installation of Balance of Plant works: EHV Line, PSS, GSS Bay extension work, 33 KV Line, USS
- Ensure that all work is carried out safely and in accordance with relevant regulations and company policies.
- Monitor project progress and ensure that it is completed on time and within budget.
- Work closely with other engineers, technicians, and contractors to ensure that the project is delivered to the required quality standards.
- Conduct site inspections and tests to ensure that the system is operating correctly and efficiently.
- Prepare reports and documentation on project progress and technical specifications.
- Liaise with customers and stakeholders to ensure that their needs and requirements are met.
- Manage and monitor the work of other engineers, technicians, and contractors on site.
- Post erection/ installation complete the inspection and testing checklists mentioning the observations, if any. In case of major observations/ Defects, notify site management and issue Quality NCRs/ Observation reports to EPC Partners and subsequent follow-ups to get the detects/ observations cleared.
- Witness of testing and pre-commissioning/ commissioning activities.
- Handing over of Assets to O&M
- Billing & Contractor Management
- Monitor the Erection/ Installation, Testing & pre-commissioning, Commissioning activities of the following as per SOP & FQP:
- Transmission Line works, e.g. Tower Foundation/ Erection, Stringing of Conductors & OPGW,
- PSS Erection & Installation works: Structure & Equipment Erection, Main Power Transformer & Auxiliary Transformers Erection, Laying of Bus Bar, Power & Control Cables, Termination of Cables at various Equipment s e.g., Circuit Breakers, Isolators, Earth Switch, Current Transformer, Potential Transformer, Main Power Transformers along with NIFPS, Earthing Material, Conductor, OPGW, Insulators & hardware.
- Main Control Room: Installation of Control & Relay Panels, 220 KV, 33kV Switchgear, SCADA Panels, Auxiliary Transformers, Battery Bank, ACDB, DCDB, LDB, FOTE, Power plant Monitoring systems, WMS etc. Cable Laying & Termination as per cable schedule.
- 33 KV Line work: installation & Monitoring of 33 KV line work (SC & DC Line) as per FQP/ SOP / Approved drawings
- Finalization of Pending Points, Handing over of BOP systems to O&M
- Monitor SCADA, communication systems, protection systems and metering systems installation.
- Inspection & Validation on Receipt of the following:
- Transmission Line Materials: Stub & Tower materials, Earthing Material, Conductor, OPGW, Insulators & hardware.
- PSS Equipment/Materials: Foundation Stubs & Structure Material, Bus Bar, Circuit Breakers, Isolators, Earth Switch, Current Transformer, Potential Transformer, Main Power Transformers along with NIFPS, Earthing Material, Conductor, OPGW, Insulators & hardware.
- Main Control Room Equipment/Materials: Control & Relay Panels, 33kV Switchgear, SCADA Panels, Auxiliary Transformers, Battery Bank, ACDB, DCDB, LDB, etc.
- USS Equipment / Materials: Control & Relay Panels, structure Materials, Transformer, VCB, CT, PT, etc.,
- 33 KV Line Materials: Poles, structures, Conductors, OFC & other related materials
- Post Inspection complete the inspection checklist mentioning the observations, if any. In case of major observations/ Defects, notify site management and issue Quality NCRs/ Observation reports to EPC Partners and subsequent follow-ups to get the detects/ observations cleared.
- Maintaining Valid Records, Updated drawings, FQP, SOP, Checklist , DPR , Material Register, Delay Register,
- Coordination with Teams for Pre-commissioning & Commissioning , STPT and other relevant activities
- Billing & Contractor Management
- Finalization and certification of Measurement sheet and Job completion certificate/ Running Bills based on Milestone as per vendor agreement
- Provide input to Project Management team on HSSE observation aspect to Project Management team.
- Make observations of safety non-conformance for each contractor. Conduct discussions with contractors about safety improvements.
- Ensure PPE compliance at site as per agreed standards
- Ensure and adhere the PTW system during project phase
- Attend and conduct the TBT and Sunset meeting.
- Any safety non-compliance at site, bring immediate attention to Project Management team.
- Ensure LTI free site during project phase.
- Create awareness of BBS and other safety initiatives
- INTERACTIONS
- SKILLS AND KNOWLEDGE
- Bachelor of Engineering (Electrical) / Diploma in Electrical Engineering
- Additional Qualification: - Post Graduation in Project/ Construction Management will be preferred
- Strong knowledge of Wind projects Electrical systems
- Familiarity with relevant regulations, codes, and standards in Wind energy
- Experience in managing and supervising teams of engineers, technicians, and contractors
- Excellent communication and interpersonal skills, with the ability to work effectively in a team environment
- Strong analytical and problem-solving skills, with the ability to troubleshoot technical issues on site
- Proficient in Microsoft Office and project management software
- Overall experience: 8-10 years for Graduates / 10-14 years for Diploma Holders
- Minimum of 6-8 years of experience in Wind project installation
Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
Sourced from naukri
Skills
About Apraava Energy

Apraava Energy
Power
201-500
employees
2002
24 years old
Mumbai, Maharashtra
India
₹16.4L PA avg
Avg at Apraava Energy
About
Apraava Energy is an integrated energy solutions provider, jointly owned by the CLP Group —one of the largest investor-owned power businesses in Asia and Caisse de dépôt et placement du Québec (CDPQ) —a global investment group. Founded in 2002, Apraava has evolved from being a single-asset company to a forward-looking, climate-conscious organisation. Our portfolio comprises 3,150 MW of installed
capacity which includes 924 MW of wind and 250 MW of solar energy projects across seven states, a 1320 MW coal-fired super critical power plant and two power transmission assets. We have also forayed into Advanced Metering Infrastructure (AMI) business and will install around 3 million smart meters in Assam and Gujarat.
The company aims to invest in low-carbon growth areas, including renewable energy, power transmission and distribution, as well as other non-generation, customer-focused energy businesses. Apraava Energy is among the handful Indian power sector companies to commit to the SBTi and only the second in the sector to have them validated.
We want to create a future that will accelerate India’s clean and green vision. We are committed to building a legacy that our future generations will cherish and nurture.
Industries
Employee ratings
10 reviews
Culture
4.8
Career growth
3.0
Work-life
4.8
Employees rate it well for
Find them on