CHENNAI · FULLTIME
Lead Electrical/Project Engineer-EPC
GE Vernova
Chennai · onsite · Posted 50d ago
Sourced from
Undisclosed10–15 yrsfulltimeChennai
About a minute. You'll make an account on the way through.
agent · working
- Read this posting0.8s
- Found the form on Naukri · 5 questions to answer1.4s
- Decided the answers for all of them2.6s
- Tailor your résumé to this role
- Waiting for you
Section · 01
About this role
Job Description Summary Job Description Roles and Responsibilities Additional Information
Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
- Take care of project deliverables, co-ordinate with multiple stake holders, detailed engineering, controls software validation, commissioning support for Solar, Battery energy storage system (BESS) & Hybrid Plant Control System and Inverter.
- Single point of contact for technical issues for the customer and project manager.
- Track overall status of project deliverables for the assigned projects to meet team goals.
- Responsible for leading and coordinating all balance of plant technical aspects of energy storage projects, including developing single line drawings and schematics, plan and elevation drawings, general arrangement and site layout, relay protection and control requirements, layouts for LV/HV equipment, conduit, cable, wiring, grounding, and control buildings. In addition, as the technical leader for assigned engineering projects or a program of projects, responsibilities also include activities such as schedule development and updates, supporting sourcing initiatives, planning and tracking project design reviews, quality control/quality assurance, and contractor management.
- Develop, improve, and administer customer overview and operational training material for the control system.
- Work across the Hybrid engineering and services organizations to prepare documentation for installation, commissioning, and operations for use by internal GE employees and our customers.
- Drive performance and reliability enhancements back to the product
- Coordinate with sourcing and the project team on technical matters to meet project specifications, cost control objectives, and schedule objectives. Accountable for team results to deliver a high-quality product to customer requirements on time and on or under budget.
- Define processes and procedures, perform RCAs (Root Cause Analysis), perform corrective actions, and validate process control. Support quality and standardization initiatives.
- Bachelor/Master degree in Electrical / Electronics / Instrumentation / Controls Engineering / Science from an accredited college or university
- Minimum of 10+ years of experience with detailed engineering, EPC, Project execution, Control software design / development / implementation.
- Expertise in Solar, Energy storage, Plant level system, Inverter, Transformer, RMU, BOP plant equipment s validation and verification, systems integration etc.
- Experience in leading large scale engineering projects, EPC, detailed engineering, Simulation models, Power Electronic equipment s, Product design and site experience.
- Experience in various countries grid code compliance
- Worked in any power generation industry like renewable, thermal, nuclear etc.
- Experience in communication networks equipment s functionality, Selection, Software features and Hardware & Cyber security.
- Experience in implementation of controls or systems integration in products and field engineering experience
- Knowledge in GE s MarkVIe product & tools like GE s Toolbox ST, Workstation ST, Cimplicity software (SCADA), P80i software, HDM & Simulink.
- Experience in interpreting power system design output such as: SLDs, LV & MV Protection & Co-ordination / Voltage Drop / Dip Calculations / Load Flow and Fault Studies / Arc Flash Calculation/ Transient System and scenario analysis / Harmonic (VTHD) calculations / MV & LV power system cabling (cable selection, rating etc.) / Quality of Power Supply / EMC.
- Design system/equipment to meet reliability, testing standards, manufacturability, material and cost guidelines
- Ability to summarize and communicate complex technical information
- Strong problem analysis and resolution skills
- Curiosity, passion for excellence, drive to deliver on time
- Knowledge of power conversion systems and controls.
- Present technical plans in voice of customer
- Experience in working cross-functionally between Engineering, Sourcing, Manufacturing, Logistics, Product Management, etc.
- Self-start attitude is strongly requested
- Strong oral and written communication skills.
- Strong interpersonal and leadership skills.
Relocation Assistance Provided: Yes
Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
Sourced from naukri
Section · 02
Skills
Product DesignInstrumentationthermalSCADAManager Quality AssuranceManager Quality ControlSimulationSimulinkEPCSystem Design
Section · Company
About GE VERNOVA
GE Vernova
Power
10k+
employees
Cambridge, MA
US
About
Addresses the urgent challenge of decarbonizing commercial aviation, aiming to innovate for a sustainable future in flight.
Industries
PowerHardware & NetworkingEngineering & ConstructionOil & GasSoftware ProductIndustrial Automation
Employee ratings
1,495 reviews
4.1/ 5
Culture
4.1
Career growth
3.3
Work-life
4.1
Employees rate it well for
Work Culture189Work Life Balance169Job Security148Learning112Senior Management110
Find them on