Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 18734955

    Apraava Energy logo

    Field Quality Manager - Quality Management and Technical Support

    Apraava Energy · Hyderabad · onsite · Posted 31d ago

    Undisclosed13–15 yrsfulltimeSourced fromNaukri

    About a minute. You'll make an account on the way through.

    About this role

    1. PRINCIPAL ACCOUNTABILITIES:
    Accountabilities Major Activities
    Quality Management 1. Quality Planning Documentation
    - Implement Field Quality Plan (FQP) and Inspection Test Plans (ITPs) for WTG, Substation and Transmission line works.
    - Follow OEM Guidelines, PQHC Requirements.
    - Storage Maintenance of WTG Components.
    - Review Approve Crane related Machinery.
    - Certified Climbing on WTG TT Tower.
    - Prepare, Review and approve contractors method statements and work procedures.
    - Prepare Implement PQP, SOP, Check lists Formats in line with OEM requirements, TS, Codes Standards and FQP.
    - Maintain comprehensive QA/QC records - inspection reports, RFI s, Check Lists, RA Bills, FOM NCR s, calibration certificates, test results, and approvals.
    2. Incoming Material Inspection
    - Verification of material and equipment quality against approved drawings and specifications.
    - Check manufacturer s test certificates and shipping documents.
    - Site inspection for:
    o Blade, Nacelle, Hub, Tubular Tower and Other WTG BOQ.
    o USS, Transformers, Reactors, AIS equipment, breakers, CTs, PTs, isolators, LA, SVG s, HT/LT SGR Panels .
    o Conductors, insulators, hardware fittings.
    o Steel structures, tower members, bolts/nuts, earthing materials.
    3. WTG Foundation, Installation Quality Oversight
    - Civil works: Geo tech reports review, Survey, Marking, Excavation, PCC, RCC foundations, USS foundations, cable ducts, Back Filling, Roads, 33kv as per specs.
    - Aggregates, Cement, Cubes Casting , Traceability, Curing Testing.
    - PQHC Implementation as per OEM Guidelines
    4. TT Tower Installation
    - Verify foundation interface before tower erection.
    - Check tower section identification and erection sequence.
    - Inspect flange mating surfaces and cleanliness.
    - Verify correct bolt grade, size and quantity.
    - Ensure correct bolt tightening sequence.
    - Verify torque/tensioning using calibrated tools as per OEM procedure.
    - Check bolt marking after tightening.
    - Inspect verticality and alignment tower.
    - Verify internal platforms, ladders and safety systems.
    - Ensure proper earthing continuity.
    5. Nacelle Installation
    - Verify nacelle lifting arrangement as per approved lifting plan.
    - Check nacelle interface and mounting arrangement.
    - Verify yaw connection and locking arrangement.
    - Inspect fastening and torque records.
    - Check gearbox, generator and drivetrain connections.
    - Verify lubrication and cooling system connections.
    - Check hydraulic and electrical connections.
    - Ensure all transportation locks are removed as per OEM procedure.
    6. Hub and Blade Installation
    - Verify hub serial number and orientation.
    - Inspect pitch bearing and pitch system connections.
    - Verify blade identification and correct blade position.
    - Inspect blades for cracks, scratches, delamination and transportation damage.
    - Check bolt condition and tightening requirements.
    - Verify blade root connection.
    - Check blade pitch operation.
    - Verify lightning protection connections
    7. Electrical Installation
    - Verify installation of:
    o Power cables.
    o Control cables.
    o Fibre optic/communication cables.
    o Earthing conductors.
    o Transformer connections.
    o Converter and control panels.
    - Ensure correct cable routing and clamping.
    - Verify cable identification and termination.
    - Check terminal tightening.
    - Conduct insulation resistance tests, as applicable.
    - Verify continuity of protective earthing.
    - Inspect cable glands and enclosure sealing.
    - Verify phase identification and polarity where applicable.
    8. Mechanical and Functional Testing
    Coordinate and witness, as applicable:
    - Drivetrain rotation checks.
    - Gearbox inspection.
    - Lubrication system functional test.
    - Cooling system functional test.
    - Hydraulic system functional test.
    - Yaw system functional test.
    - Pitch system functional test.
    - Brake functional test.
    - Generator functional checks.
    - Noise and abnormal vibration observations.
    9. Electrical Testing Commissioning Readiness
    Verify and witness:
    - Insulation Resistance (IR) tests.
    - Continuity tests.
    - Earthing continuity tests.
    - Control circuit checks.
    - Sensor and limit switch verification.
    - Emergency stop functionality.
    - Interlock checks.
    - Alarm and protection verification.
    - SCADA/communication checks.
    - Transformer pre-commissioning tests, as applicable.
    - Functional operation of auxiliaries.
    10. Quality Documentation NCR Management
    - Raise and track IMIRs/RFIs for all critical installation stages.
    - Maintain inspection and test records.
    - Review OEM installation checklists.
    - Verify torque/tensioning records.
    - Maintain component serial number traceability.
    - Raise NCRs for deviations from drawings, specifications or OEM requirements.
    - Review root cause and corrective action.
    - Verify rectification and close NCRs.
    11. Final Inspection Handover
    - Before commissioning/handover, verify:
    - Completion of all installation checklists.
    - Closure of punch points.
    - Closure of NCRs.
    - Completion of all mandatory tests.
    - Availability of test certificates.
    - Completion of torque/tensioning records.
    - Earthing and lightning protection completion.
    - Correct labelling and identification.
    - Housekeeping and foreign material removal.
    - Completion of as-built documentation.
    12. Stores Management
    - Auditing Inspecting Stores
    - Audit Report Generation ensure compliance on findings
    - Ensure to follow Stores SOP OEM Guidelines in storing and preservation.
    -
    13. Transmission Line SS Quality Oversight
    - Tower foundation type checks (pile, raft, chimney, pad chimney, etc.).
    - Cubes Casting , Traceability, Curing Testing.
    - Tower erection quality checks: verticality, tightening torque, member placement.
    - Conductor stringing: sagging, tensioning, mid-span joints, compression fittings.
    - OPGW/earth wire installation and optical fiber testing.
    - Witness line tests: continuity, insulation, and earthing resistance.
    14. Testing Commissioning QA
    - Prepare, Review testing formats Check lists, SOPS.
    - Witness substation pre-commissioning tests (transformers, breakers, relays).
    - Line pre-energization checks and statutory clearances.
    - Ensure proper documentation for energization approval.
    15. Non-Conformance Corrective Action
    - Raise NCRs for deviations from standards or drawings.
    - Verify corrective preventive action closure.
    - Conduct root cause analysis for repeated issues.
    - Resolution plan follow-up of NCR closure on open NCR.
    - Avoid repeatability of NCR s.
    16. Handover Final Quality Dossier
    - Ensure all QA/QC documentation is complete for PAC (Provisional Acceptance Certificate).
    - Maintain punch list and verify closure.
    - Deliver final Quality Dossier for both substation and line.
    17. Reporting Coordination
    - Daily weekly Monthly quality reports to Project Manager and Corporate QA.
    - Coordinate with EPC OEM inspectors for joint inspections.
    - Liaise with statutory bodies for mandatory inspections.
    Technical Innovation Developing Solutions - Adopt digital quality tools, non-conformance tracking systems, and real-time quality data analytics.
    Business Planning Budget Forecasting - Budget allocation for quality engineers, inspectors, and specialists at project sites
    - Provision for quality tools (measuring instruments, test kits), digital platforms (QMS software, NCR tracking), third-party inspections, lab testing, for his site
    Developing self and others - Conduct regular training and awareness programs on quality standards, root cause analysis (RCA)
    - Promote a culture of zero-defect and first-time-right execution
    Management Functions - Monitor Update FQR data on Wrench Portal.
    - Provide quality assurance reports to internal management, clients, and lenders.
    - Showcase quality credentials through audit clearances, and compliance records.
    Interface with Hong Kong - Showcase quality credentials through audit clearances, and compliance records

    2. INTERACTIONS
    Internal Clients:
    Roles you need to interact with inside the organization to enable success in your day-to-day work
    All roles in Field Quality Manager
    Operating Business Units within Apraava Energy
    Project Team
    BD Contracts Team
    Apraava Management team
    PMO teams at CLP Hong Kong
    External Clients:
    Roles you need to interact with outside the organization to enable success in your day-to-day work
    Vendors / EPC partners / Consultants / Contract partners/OEM s
    3. SKILLS AND KNOWLEDGE
    Educational Qualifications:
    - Essential:
    10 + Year experience with B.E./B. Tech in Mechanical (Preferred)/Civil Engineering from a recognized university.
    - Acceptable Alternate: Diploma in Electrical Mechanical/Civil Engineering with 13-15+ years of relevant QA/QC experience in Wind projects.
    - Preferred Certifications:
    ISO 9001:2015 Lead Auditor or QA/QC certification.
    Training in IEC/IS standards applicable to transmission projects.
    RCA - CAPA 8D.
    Six Sigma Green Belt.
    Functional Skills:
    Technical Skills
    o Strong knowledge of AIS/GIS substation and OHTL construction and quality requirements.
    o Familiarity with Indian Standards (IS), IEC, and relevant CPWD/CBIP/CEA guidelines.
    o Ability to interpret engineering drawings, method statements, and ITPs.
    o Expertise in electrical testing (Transformer, SGR, SVG, insulation, contact resistance, ratio tests, SF6 leakage, relay settings).
    o Experience in tower erection, conductor stringing, and OPGW installation quality control.
    o Material inspection skills for high-voltage equipment, conductors, insulators, hardware fittings, and steel structures.
    Quality Management Skills
    o Hands-on experience in preparing and implementing PQP, ITP, and method statements.
    o NCR/CAPA management and root cause analysis.
    o QA/QC documentation and dossier preparation for handover.
    Soft Skills
    o Strong coordination and stakeholder management (EPC contractors, OEMs, client inspectors).
    o Clear communication, both verbal and written, for reporting and inspection notes.
    o Problem-solving and proactive issue prevention.
    - Ability to work under tight deadlines and remote site conditions.


    Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.

    Sourced from naukri

    Skills

    AuditingCompressionDossiercontrol panelsdigital platformscooling systembudget forecastingcivil worksCAPA8DBOQAnalyticsconstructionBusiness PlanningData AnalyticsbreakersAudit ReportcomplianceCivil Engineering

    About Apraava Energy

    Apraava Energy logo

    Apraava Energy

    Power

    201-500

    employees

    2002

    24 years old

    Mumbai, Maharashtra

    India

    ₹16.4L PA avg

    Avg at Apraava Energy

    About

    Apraava Energy is an integrated energy solutions provider, jointly owned by the CLP Group —one of the largest investor-owned power businesses in Asia and Caisse de dépôt et placement du Québec (CDPQ) —a global investment group. Founded in 2002, Apraava has evolved from being a single-asset company to a forward-looking, climate-conscious organisation. Our portfolio comprises 3,150 MW of installed
    capacity which includes 924 MW of wind and 250 MW of solar energy projects across seven states, a 1320 MW coal-fired super critical power plant and two power transmission assets. We have also forayed into Advanced Metering Infrastructure (AMI) business and will install around 3 million smart meters in Assam and Gujarat.

    The company aims to invest in low-carbon growth areas, including renewable energy, power transmission and distribution, as well as other non-generation, customer-focused energy businesses. Apraava Energy is among the handful Indian power sector companies to commit to the SBTi and only the second in the sector to have them validated.

    We want to create a future that will accelerate India’s clean and green vision. We are committed to building a legacy that our future generations will cherish and nurture.

    Industries

    Power

    Employee ratings

    10 reviews

    4.4/ 5

    Culture

    4.8

    Career growth

    3.0

    Work-life

    4.8

    Employees rate it well for

    Job Security45Work-Life Balance45

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Field Quality Manager - Quality Management and Technical Support · waiting for your command