Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 20285027

    BHUJ · FULLTIME

    Engineer

    Kp Energy logo

    Kp Energy

    Bhuj · hybrid · Posted 18d ago

    Sourced fromNaukri
    Undisclosed2–7 yrsfulltimeBhuj

    About a minute. You'll make an account on the way through.

    agent · working

    • Read this posting0.7s
    • Found the form on Naukri · 5 questions to answer1.6s
    • Decided the answers for all of them2.7s
    • Tailor your résumé to this role
    • Waiting for you

    Section · 01

    About this role

    Role & responsibilities

    Wind O&M Technician , Engineer, Sr. Engineer (BOP & PSS) -

    Experience: 2-8 years
    Qualification: ITI / Diploma - Electrical

    Daily Rounds

    • Check turbine SCADA status and generation trend vs wind resource
    • BOP equipment (transformers, switchgear, cables) - visual + audible checks
    • PSS (Power Substation) equipment: transformer oil temp/level, breaker status, relay indications
    • Note any tripped feeder/breaker and reason before resetting

    Preventive Maintenance

    • HT/LT panel PM: tightness checks, cleaning, thermography
    • Transformer PM: oil sampling (as per schedule), Buchholz relay check, breather silica gel condition
    • Breaker PM: contact resistance, mechanism greasing, trip/close timing test
    • Cable trench/pit inspection for water ingress or damage

    Fault Troubleshooting & Restoration

    • Get exact fault code/alarm from SCADA before dispatch
    • Common BOP faults: cable faults, transformer protection trips, breaker mechanism failure
    • Restore only after root cause is identified - don't just reset and walk away
    • Document downtime, cause and corrective action for MIS/reporting

    Reporting

    • Daily generation report, downtime log and PM/BM records - update without delay
    • Escalate repeat faults immediately (pattern = bigger issue brewing)

    Safety

    • PTW mandatory for HT equipment work
    • LOTO on all isolation points, verify zero energy state before touching
    • Confirm switching sequence with control room before any operation
    • Never enter PSS switchyard without authorization and proper PPE




    Sourced from naukri

    Section · 02

    Skills

    BOP33kvSubstationWindPSSWind Energy66KvTransmission LineRenewable EnergyOperation Maintenance

    Section · Company

    About Kp Energy

    Kp Energy logo

    Kp Energy

    Power

    175

    employees

    1994

    32 years old

    Surat, Gujarat

    India

    ₹3.7L PA avg

    Avg at Kp Energy

    About

    KP Energy Ltd. provides comprehensive solutions for wind farm projects, leading innovations in renewable energy to promote sustainable practices in India.

    Industries

    Power

    Employee ratings

    10 reviews

    4.3/ 5

    Culture

    4.0

    Career growth

    3.7

    Work-life

    4.1

    Employees rate it well for

    Skill Development43Overall Company43

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Engineer · waiting for your command