BHUJ · FULLTIME
Engineer
Kp Energy
Bhuj · hybrid · Posted 18d ago
Sourced from
Undisclosed2–7 yrsfulltimeBhuj
About a minute. You'll make an account on the way through.
agent · working
- Read this posting0.7s
- Found the form on Naukri · 5 questions to answer1.6s
- Decided the answers for all of them2.7s
- Tailor your résumé to this role
- Waiting for you
Section · 01
About this role
Role & responsibilities
Wind O&M Technician , Engineer, Sr. Engineer (BOP & PSS) -
Experience: 2-8 years
Qualification: ITI / Diploma - Electrical
Daily Rounds
- Check turbine SCADA status and generation trend vs wind resource
- BOP equipment (transformers, switchgear, cables) - visual + audible checks
- PSS (Power Substation) equipment: transformer oil temp/level, breaker status, relay indications
- Note any tripped feeder/breaker and reason before resetting
Preventive Maintenance
- HT/LT panel PM: tightness checks, cleaning, thermography
- Transformer PM: oil sampling (as per schedule), Buchholz relay check, breather silica gel condition
- Breaker PM: contact resistance, mechanism greasing, trip/close timing test
- Cable trench/pit inspection for water ingress or damage
Fault Troubleshooting & Restoration
- Get exact fault code/alarm from SCADA before dispatch
- Common BOP faults: cable faults, transformer protection trips, breaker mechanism failure
- Restore only after root cause is identified - don't just reset and walk away
- Document downtime, cause and corrective action for MIS/reporting
Reporting
- Daily generation report, downtime log and PM/BM records - update without delay
- Escalate repeat faults immediately (pattern = bigger issue brewing)
Safety
- PTW mandatory for HT equipment work
- LOTO on all isolation points, verify zero energy state before touching
- Confirm switching sequence with control room before any operation
- Never enter PSS switchyard without authorization and proper PPE
Sourced from naukri
Section · 02
Skills
BOP33kvSubstationWindPSSWind Energy66KvTransmission LineRenewable EnergyOperation Maintenance
Section · Company
About Kp Energy

Kp Energy
Power
175
employees
1994
32 years old
Surat, Gujarat
India
₹3.7L PA avg
Avg at Kp Energy
About
KP Energy Ltd. provides comprehensive solutions for wind farm projects, leading innovations in renewable energy to promote sustainable practices in India.
Industries
Power
Employee ratings
10 reviews
4.3/ 5
Culture
4.0
Career growth
3.7
Work-life
4.1
Employees rate it well for
Skill Development43Overall Company43
Find them on