Engineer (Instrumentation)
IndianOil LNG · Chennai · onsite · Posted 41d ago
About a minute. You'll make an account on the way through.
About this role
Role & responsibilities
- Installation, programming, commissioning, & maintenance of control systems including DCS, ESD, PLC, SCADA, MCMS, Cyber security systems etc.
- Thorough knowledge of communication protocols and various system communications.
- Experience in ABB 800 XA DCS system will be an added advantage.
- Experience in Siemens PLC systems and Rockwell PLC systems will be an added advantage.
- Experience in Foundation Fieldbus systems will be an added advantage.
- Attending the jobs as per the work permit.
- Perform Preventive Maintenance & breakdown call if any.
- Equipment performance checking.
- All control system maintenance including DCS, PLC, Machine conditioning monitoring systems, Fire & gas systems etc.
- Logic modifications in control systems.
- Implementation of new modification works.
- Supporting in various audits and compliances.
- Supporting in various projects.
- Material & spares management.
- Up keeping all the department documents.
- Cooperate and coordinate with other related functions.
Preferred candidate profile
- Full Time Degree in Engineering in Instrumentation/ Instrumentation & Control with Minimum 60% marks (or equivalent CGPA) from a recognized University / Institute approved by AICTE.
- Experience in Automation industries/LNG/Oil & Gas / Refinery/Petrochemical / Fertilizer / Chemical / Cryogenic Industry shall be preferred
Note:
1. Maximum Age : 33 Years as on 10.09.2026
2. Minimum 3-5 Years Post Qualification executive experience (excluding Training Period required)
3. Last Date of application: 17.09.2026
Sourced from naukri
Skills
About IndianOil LNG

IndianOil LNG
Engineering & Construction
201
employees
Chennai, Tamil Nadu
India
₹8.9L PA avg
Avg at IndianOil LNG
₹10L – ₹12L PA
This role
About
About company
IndianOil LNG Private Limited (IOLPL), a Joint Venture company of IndianOil Corporation Limited, was incorporated on 29.05.2015 under the Companies Act, 2013 for implementation of Ennore LNG Import, Storage, and Re-gasification Terminal Project of 5 MMTPA capacity with provision to expand up to 10 MMTPA with at estimated cost of Rupees 5151 Crores inside the Kamarajar Port, Chennai.
IOLPL commenced construction of the terminal in 2015 and completed/commenced operations in 2019.
Industries
Employee ratings
10 reviews
Culture
1.8
Career growth
1.7
Work-life
3.4
Employees rate it well for
Find them on