Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 16514150

    Avaada Group logo

    Electrical (USS & 33 kV Transmission Line) Wind Power Project

    Avaada Group · Not specified · onsite · Posted 43d ago

    Undisclosed8–13 yrsfulltimeSourced fromNaukri

    About a minute. You'll make an account on the way through.

    About this role

    Position

    Electrical - USS & 33 kV Transmission Line Wind Power Project



    Job Purpose

    To lead and manage the execution, installation, testing, and commissioning of Underground Cabling Systems (USS) and 33 kV Transmission Line (TL) works for wind power projects, ensuring compliance with safety, quality, and project timelines.

    Key Responsibilities


    Underground Cabling System (USS)

    • Plan and supervise 33 kV underground cable laying activities for wind farm evacuation systems.
    • Monitor trenching, cable laying, jointing, termination, and route marker installation.
    • Ensure compliance with approved drawings, route plans, and project specifications.
    • Coordinate with civil and WTG erection teams for cable corridor readiness.
    • Verify cable testing activities including insulation resistance, sheath integrity, and HV testing.

    33 kV Transmission Line (TL)

    • Lead erection and commissioning of 33 kV overhead transmission lines.
    • Supervise foundation works, pole/tower erection, stringing, sagging, and earthing activities.
    • Ensure compliance with electrical and statutory standards.
    • Coordinate line charging and grid connectivity activities with utility authorities.

    Testing & Commissioning

    • Coordinate testing and commissioning of:
      • 33 kV Cable Networks
      • RMUs and Switchgear
      • Protection Systems
      • Earthing Systems
      • Communication and SCADA Interfaces
    • Support grid synchronization activities and energization of feeder lines.

    Project Management

    • Monitor project progress against schedules and milestones.
    • Coordinate with contractors, consultants, OEMs, and client representatives.
    • Resolve site execution issues and technical challenges.
    • Ensure material availability and optimize resource deployment.

    Quality Assurance

    • Ensure work execution complies with approved method statements and quality plans.
    • Review inspection reports, test certificates, and commissioning documentation.
    • Maintain as-built records and project handover documents.

    HSE Responsibilities

    • Implement project HSE requirements and electrical safety standards.
    • Conduct toolbox talks and safety audits.
    • Ensure compliance with Permit-to-Work (PTW) and Lockout-Tagout (LOTO) procedures.
    • Maintain zero-incident culture at site.

    Qualification

    • B.E./B.Tech or Diploma in Electrical Engineering.

    Experience

    • 8 - 15 years of experience in electrical project execution.
    • Minimum 5 years in wind power projects.
    • Hands-on experience in USS and 33 kV Transmission Line execution and commissioning.

    Technical Skills

    • 33kV Underground Cabling Systems
    • 33kV Overhead Transmission Lines
    • Cable Jointing & Termination
    • RMU & Switchgear Operations
    • Earthing Systems
    • Protection & Control Systems
    • SCADA Integration
    • Electrical Testing & Commissioning
    • Grid Connectivity & Synchronization
    • AutoCAD and Electrical Drawings

    Sourced from naukri

    Skills

    33kv33 kV Transmission LineWind Power

    About Avaada Group

    Avaada Group logo

    Avaada Group

    Power

    641

    employees

    2009

    17 years old

    Mumbai,Maharashtra

    US

    ₹14.1L PA avg

    Avg at Avaada Group

    About

    Avaada, our name springs from this very promise. It is a promise to create a sustainable future by working for the benefit of the environment and all our communities

    Industries

    PowerInternet

    Employee ratings

    0 reviews

    4.2/ 5

    Employees rate it well for

    Job Security42Overall Company42

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Electrical (USS & 33 kV Transmission Line) Wind Power Project · waiting for your command