Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 12155085

    Steag Energy Services logo

    Civil Structure Head

    Steag Energy Services · Bhagalpur · onsite · Posted 65d ago

    Not disclosed20–25 yrsfulltimeSourced fromFoundit

    About a minute. You'll make an account on the way through.

    About this role

    STEAG Energy Services India is hiring for exciting opportunities across various Adani Projects.

     

    Civil Structure Head

             

    Job description:

     

    • Lead and manage all civil, structural and infrastructure engineering activities for the power plant.
    • Review and approve designs, drawings, calculations and technical specifications for RCC, structural steel, foundations, buildings and plant structures.
    • Supervise civil works for boiler, turbine, coal handling, ash handling, cooling tower, chimney, ESP, FGD, water systems and BOP areas.
    • Ensure compliance with applicable IS codes, project specifications, quality standards, safety requirements and statutory requirements.
    • Coordinate with engineering consultants, EPC contractors, vendors and other discipline heads.
    • Monitor construction progress, quality, quantities, technical issues and contractor performance.
    • Review site conditions, identify design/construction issues and provide technically sound solutions.
    • Support cost estimation, tendering, technical evaluation, variation assessment and contract administration related to civil/structural works.
    • Ensure proper inspection, testing, documentation, as-built drawings and handover of civil/structural works.
    • Verification of necessary certificates and licenses, permits & clearances required to carry out this work from the respective statutory/ local authorities are to be arranged by the contractor at his cost in time to ensure smooth progress of work

     

    Hiring Locations : We are hiring for multiple project locations across India. The positions will be based at the respective project sites listed below:

     

    1.          Pirpainti, Bhagalpur, Bihar - Pirpaainti TPP (3 × 800 MW)

    2.          Anuppur, Madhya Pradesh - Anuppur TPP (3 × 800 MW)

    3.          Korba, Chhattisgarh - Korba Phase III TPP (2 × 800 MW)

    4.          Mirzapur, Uttar Pradesh - Mirzapur TPP (2 × 800 MW)

    5.          Baran, Rajasthan - Kawai Phase II (2 × 800 MW)

    6.          Salkocha, Dhubri, Assam - Assam TPP (4 × 800 MW)

    7.          Raipur, Chhattisgarh - Raipur Phase III (2 × 800 MW)

    8.          Raigarh, Chhattisgarh - Raigarh Phase III (2 × 800 MW)

     

    Locations at a Glance : Bhagalpur| Shahdol | Korba|

     

    Candidates should be willing to work at the respective project site locations based on the role and project requirement.

     

    Locations at a Glance : Bihar | Madhya Pradesh | Chhattisgarh | Uttar Pradesh | Rajasthan | Assam| Raipur| Raigarh

    Sourced from foundit

    Skills

    Boiler Civil WorksBuilding StructuresPlant StructuresStructural EngineeringThermal Power PlantStructural Steelcivil infrastructureFoundation DesignRCC designPowerplant EngineeringCivil Engineering

    About Steag Energy Services

    Steag Energy Services logo

    Steag Energy Services

    Power

    1.6k+

    employees

    2000

    26 years old

    Essen, Essen

    Germany

    ₹8.5L PA avg

    Avg at Steag Energy Services

    About

    Global leader in power asset services, managing over 100,000 MW across 80 countries, with 5,973 MW under operation in India.

    Industries

    Power

    Employee ratings

    10 reviews

    4.2/ 5

    Culture

    4.4

    Career growth

    4.0

    Work-life

    4.4

    Employees rate it well for

    Job Security43Overall Company42

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Civil Structure Head · waiting for your command