Agent
Jobs
Applied
Tracker
Profile
    1. Jobs for you
    2. Job

    Job · 11625443

    Steag Energy Services logo

    Batching Plant

    Steag Energy Services · Bhagalpur · onsite · Posted 68d ago

    Not disclosed5–10 yrsfulltimeSourced fromFoundit

    About a minute. You'll make an account on the way through.

    About this role

    STEAG Energy Services India is hiring for exciting opportunities across various Adani Projects.

    Batching Plant 

    Job description:

    • Supervise and monitor operation of the concrete batching plant for construction activities.
    • Ensure proper batching, mixing, and supply of concrete as per approved mix designs and project specifications.
    • Monitor quality of raw materials, concrete production, slump, strength and other required tests in coordination with the QA/QC team.
    • Coordinate concrete requirements, dispatch schedules and delivery to various work fronts.
    • Check plant equipment, calibration, preventive maintenance and availability of critical spares.
    • Maintain production records, material consumption, equipment logs and daily reports.
    • Ensure compliance with approved procedures, safety requirements and environmental controls.
    • Coordinate with EPC contractor, civil/construction teams, QA/QC and PMC personnel to resolve operational issues.
    • Monitor contractor performance and report deviations, delays and quality issues to the PMC management.

    Hiring Locations : We are hiring for multiple project locations across India. The positions will be based at the respective project sites listed below:

    1. Pirpainti, Bhagalpur, Bihar - Pirpainti TPP (3 × 800 MW)
    2. Anuppur, Madhya Pradesh - Anuppur TPP (3 × 800 MW)
    3. Korba, Chhattisgarh - Korba Phase III TPP (2 × 800 MW)
    4. Mirzapur, Uttar Pradesh - Mirzapur TPP (2 × 800 MW)
    5. Baran, Rajasthan - Kawai Phase II (2 × 800 MW)
    6. Salkocha, Dhubri, Assam - Assam TPP (4 × 800 MW)
    7. Raipur, Chhattisgarh - Raipur Phase III (2 × 800 MW)
    8. Raigarh, Chhattisgarh - Raigarh Phase III (2 × 800 MW)


    Locations at a Glance : Bihar | Madhya Pradesh | Chhattisgarh | Uttar Pradesh | Rajasthan | Assam

    Candidates should be willing to work at the respective project site locations based on the role and project requirement.

    Sourced from foundit

    Skills

    Equipment CalibrationSafety ComplianceRaw Material InspectionBatching PlantBatching Plant Operations

    About Steag Energy Services

    Steag Energy Services logo

    Steag Energy Services

    Power

    1.6k+

    employees

    2000

    26 years old

    Essen, Essen

    Germany

    ₹8.5L PA avg

    Avg at Steag Energy Services

    About

    Global leader in power asset services, managing over 100,000 MW across 80 countries, with 5,973 MW under operation in India.

    Industries

    Power

    Employee ratings

    10 reviews

    4.2/ 5

    Culture

    4.4

    Career growth

    4.0

    Work-life

    4.4

    Employees rate it well for

    Job Security43Overall Company42

    Find them on

    WebsiteLinkedInAmbitionBox reviews

    Batching Plant · waiting for your command